This tender closed on 22 June 2026. The deadline passed 156 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Sustainability Consultant for the New Wing at the National Gallery
National Gallery
- Value
- £200K
- Closes
- 22 Jun 2026Closing date passed
- Where
- United Kingdom
- Contract
- Consulting · Government
In context
This is a contract notice published by a government body covering consulting. Bids are invited through an open procedure. Delivery covers United Kingdom (Europe). It is classified under Sustainable Buildings, Circular Economy and Low-Carbon Materials against the sustainability taxonomy rather than matched on keywords.
Summary
The National Gallery seeks a Sustainability Consultant to lead development and coordination of a comprehensive sustainability strategy for a new wing, covering operational energy, embodied carbon, Whole Life Carbon, circular economy, and BREEAM certification. The ideal bidder is an experienced sustainability consultant or firm with expertise in cultural/heritage building design, carbon accounting, environmental certification, and coordination across multidisciplinary project teams.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
The National Gallery is seeking to appoint a Sustainability Consultant to support the delivery of a new building development ('New Wing') at the Gallery, located on Trafalgar Square in central London. The project involves the development of a new building integrated with the existing National Gallery estate within a highly constrained, sensitive urban, cultural and heritage context. The appointed consultant will act as lead sustainability advisor, responsible for developing and coordinating the sustainability strategy across the project. Key workstreams include operational energy, embodied carbon, Whole Life Carbon (WLC), circular economy principles, demolition and retention strategy, environmental performance, and planning policy compliance, including integration with the existing estate and heritage context. Specific responsibilities include supporting planning, statutory approval and environmental certification processes (including WLC assessments, Circular Economy Statements and BREEAM certification), coordinating with the Architect, Structural Engineer, MEP Engineer, Planning Consultant, Cost Consultant and other disciplines, and advising on sustainability considerations relating to existing buildings and heritage-sensitive contexts. The engagement is expected to run from approximately 1 August 2026 to 31 March 2032 (approximately 5 years and 8 months), covering design, procurement, construction, handover and operational stages.
Bidder eligibility
Legal and financial capacity conditions of participation are as set out in the tender documents. Technical ability conditions of participation are also as set out in the tender documents. The process includes a Procurement Specific Questionnaire (PSQ) with Pass/Fail Conditions of Participation that candidates must satisfy, covering minimum requirements for legal standing, financial capacity, insurance and project-specific technical capability.
How bids are scored
Bids are evaluated on a 70/30 quality/price split. Award criteria are: Commercial (Price) 30%; Sustainability Strategy and Technical Approach (Quality) 25%; Proposed Team (Quality) 15%; Project Understanding and Key Sustainability Challenges (Quality) 10%; Delivery Management, Coordination and Team Integration (Quality) 10%; Social Value (Quality) 10%. Clarification interviews may be held with the 3–5 top scoring applicants.
Key requirements
- Lead development and coordination of sustainability strategy across new development and integration with existing estate
- Advise on operational energy, embodied carbon, Whole Life Carbon, circular economy principles, and environmental performance
- Support planning, statutory approval, and environmental certification processes including BREEAM, Whole Life Carbon assessments, and Circular Economy Statements
- Coordinate sustainability requirements with Architect, Structural Engineer, MEP Engineer, Planning Consultant, and Cost Consultant
- Advise on sustainability considerations for demolition, retention, retrofit, and adaptation of existing heritage buildings in sensitive urban context
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)