SWW Moos bridging measures, Horn pumping station, electrical installations
Original: SWW Moos Überbrückungsmassnahmen, PW Horn, Elektroinstallationen
Stadt Zürich Wasserversorgung
- Value
- Not stated · check listing
- Closes
- 11 Jan 2027
- Where
- Switzerland
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 28 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Switzerland (CH-ZH). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Zurich Water Supply seeks electrical installation contractors to renew and rebuild the electrical systems of the Horn raw water pumping station, with a switchover during a planned autumn 2027 shutdown. Suited to experienced electrical contractors with water-plant or critical-infrastructure experience, since raw water supply must be maintained throughout the works.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Horn raw water pumping station is currently being operated via a temporary electrical infrastructure. Following the remediation of contaminants and the implementation of the necessary structural measures, all electrical installations will be completely renewed and rebuilt in accordance with current standards and fire safety requirements. Throughout the construction period, the pumping station will remain in operation via the existing temporary system, which means that the raw water supply must be guaranteed at all times. This places high demands on the planning, coordination and execution of the works. The plant shutdown scheduled for autumn 2027 will be used to switch the temporary operation over to the newly installed systems and control systems. During this period, the new infrastructure will be commissioned, the necessary switchover procedures carried out and the final functional tests conducted to lay the foundations for future routine operation. Translated with DeepL.com (free version)
Key requirements
- Complete renewal and rebuild of electrical installations to current standards and fire safety requirements
- Uninterrupted raw water supply via temporary system during construction, requiring detailed coordination
- Commissioning, switchover procedures and final functional tests during the autumn 2027 plant shutdown
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)