Skip to content
Raise Lens
Tender · simap.ch (Switzerland)

SWW Moos bridging measures, Horn pumping station, electrical installations

Original: SWW Moos Überbrückungsmassnahmen, PW Horn, Elektroinstallationen

Stadt Zürich Wasserversorgung

Value
Not stated · check listing
Closes
11 Jan 2027
 
Where
Switzerland
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Pro early accessIn public feeds and alerts from 28 Nov. This page is open to everyone now.

Raise Lens Pro

With Pro you could have had 51 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 21 Nov 202651 days to prepare
Found today · 24 Nov 202648 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Switzerland (CH-ZH). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Zurich Water Supply seeks electrical installation contractors to renew and rebuild the electrical systems of the Horn raw water pumping station, with a switchover during a planned autumn 2027 shutdown. Suited to experienced electrical contractors with water-plant or critical-infrastructure experience, since raw water supply must be maintained throughout the works.

Summary by Raise Lens from the official notice · 22 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The Horn raw water pumping station is currently being operated via a temporary electrical infrastructure. Following the remediation of contaminants and the implementation of the necessary structural measures, all electrical installations will be completely renewed and rebuilt in accordance with current standards and fire safety requirements. Throughout the construction period, the pumping station will remain in operation via the existing temporary system, which means that the raw water supply must be guaranteed at all times. This places high demands on the planning, coordination and execution of the works. The plant shutdown scheduled for autumn 2027 will be used to switch the temporary operation over to the newly installed systems and control systems. During this period, the new infrastructure will be commissioned, the necessary switchover procedures carried out and the final functional tests conducted to lay the foundations for future routine operation. Translated with DeepL.com (free version)

Key requirements

  • Complete renewal and rebuild of electrical installations to current standards and fire safety requirements
  • Uninterrupted raw water supply via temporary system during construction, requiring detailed coordination
  • Commissioning, switchover procedures and final functional tests during the autumn 2027 plant shutdown

CPV codes

Relevant sectors

Water tendersInfrastructure

How this compares

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

Sourcesimap.ch (Switzerland)
Published21 Nov 2026
Closes11 Jan 2027
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountrySwitzerland
RegionCH-ZH
Last verified22 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)