Technical assistance for control and supervision of slope stabilisation works, Madrid-Chamartín–Valencia line
Original: Asistencia técnica para el control y vigilancia de las obras de ejecución del proyecto de estabilización de desmontes entre los pp.kk. 141+681 y 145+380 de la línea 040. Madrid-Chamartín - Clara Campoamor - Valencia - Joaquín Sorolla.
ADIF Alta Velocidad - Presidencia
- Value
- €798K
- Closes
- 14 Dec 2026
- Where
- Spain
- Contract
- Consulting · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering consulting. Delivery covers Spain (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
ADIF Alta Velocidad is seeking a technical assistance firm to control and supervise the construction works that stabilise rail embankments (desmontes) between kilometre points 141+681 and 145+380 on the Madrid-Chamartín to Valencia high-speed line. A consultancy with geotechnical and rail civil-works supervision experience, able to staff on-site inspection, fits best.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The contract is a consulting engagement under CPV code 71300000 (engineering services), with the place of execution given as Cuenca, Spain, and the work to be delivered on site. The estimated value is listed as €798K, equivalent to 797,690.98 EUR. The procedure is an open procedure under ordinary processing, with no EU funding. Bids must be submitted electronically through the Plataforma de Contratación del Sector Público. The tender was published on 6 November 2026 and closes on 14 December 2026 at 11:00 (UTC+0). The record notes that the specification was annulled, reissued and later rectified in the days following publication, so the current versions of the documents should be checked on the platform.
Full description from the source
ADIF Alta Velocidad (Presidencia) is procuring technical assistance services for the control and supervision of the execution works for a slope stabilisation project (estabilización de desmontes) on line 040 Madrid-Chamartín – Clara Campoamor – Valencia – Joaquín Sorolla, between track kilometre points 141+681 and 145+380. The services are classified under CPV 71300000 (engineering services) and the place of execution is Cuenca, Spain. The tender is an open procedure (procedimiento abierto) under ordinary processing, with no EU funding. The page does not describe the detailed deliverables or the expected duration of the supervision contract. The tender record shows a status of 'Publicada' with an announcement dated 28/10/2026. It also lists a specification (pliego) annulment dated 03/11/2026, a reissued pliego the same day, and a rectification notice dated 06/11/2026. Bidders should check the current versions of the documents on the platform.
Key requirements
- Site supervision and quality control of embankment stabilisation works on the Madrid-Chamartín to Valencia high-speed line (pp.kk. 141+681 to 145+380)
- Geotechnical and civil engineering supervision expertise on rail infrastructure
- Reporting on works progress, compliance with project specifications and ADIF procedures
CPV codes
CPV codes
Relevant sectors
How this compares
How this compares
- Compared with 236 similar tenders (infrastructure in Spain) listed in the last 12 months.
- Its value of $877k is above 76% of the 192 similar tenders that state a value; their median is $292k.
- It allows 38 days to respond, longer than the typical 21 days across 217 similar tenders.
- The same organisation listed 2 other similar tenders here in the last 12 months.
Closest open tenders
- Construction management for spot repairs of bridges, walls, railings on metro lines
- Site supervision, safety coordination and quality control for Almería coastal front works
- Supply of ADV switches for Line 7 Hospital de Henares bretelle
- Construction works: closing rail track-beach area, security systems, Vilanova de Lleida
- Technical assistance to draft construction project renewing remote control on FMB rail lines
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)