Skip to content
Raise Lens
TENDER · spain-pcspgovernmentservices

Technical assistance for supervising works extending Pier A3 liquid bulk berth 2026 Tender

Original: Contratación del servicio de asistencia técnica para el control y supervisión de la ejecución de las obras del proyecto constructivo de prolongación del Muelle A3 para nuevo atraque de graneles líquidos en el Puerto Exterior de Punta Langosteira

Presidencia de la Autoridad Portuaria de A Coruña

In context

This is a contract notice published by a government body covering services. Delivery covers Spain (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

A Coruña Port Authority is procuring technical assistance to control and supervise construction works extending Pier A3 to create a new liquid bulk berth at Punta Langosteira. It suits engineering and construction-supervision consultancies with port or marine works experience, likely SME-scale.

Summary by Raise Lens from the official notice · 28 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The Autoridad Portuaria de A Coruña (Presidencia) is procuring technical assistance services for the control and supervision of the execution of the construction works for the extension of Muelle A3, a new berth for liquid bulk cargo at the Puerto Exterior de Punta Langosteira, Spain. The contract is classified as a services contract under CPV 71310000 (engineering and construction consultancy services). It is tendered through an open procedure with ordinary processing. The tender file (2026/I/144_P-1546.04.F.05) includes the announcement, the tender specifications (pliego), a justification report (memoria justificativa), a budget annotation, and the file initiation agreement. The page does not state the contract duration or detailed deliverables, which would be set out in the tender documents.

Key requirements

  • ✓Technical control and supervision of port pier extension construction works
  • ✓Construction project for new liquid bulk berth at Punta Langosteira Outer Port
  • ✓Estimated value approx. EUR 235k (EUR 284k incl. taxes/options), closing 11 Nov 2026

CPV codes

Relevant sectors

Infrastructure

How this compares

  • Compared with 78 similar tenders (infrastructure in Spain) listed in the last 12 months.
  • Its value of $313k is above 43% of the 65 similar tenders that state a value; their median is $446k.
  • It allows 17 days to respond, shorter than the typical 21 days across 73 similar tenders.
  • This is the only similar tender from this organisation listed here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.