Skip to content
Raise Lens
Tender · PCSP (Spain)Closed

Marina Baja reuse main renovation: Alfaz del Pi, Altea, Villajoyosa

Original: Obras de Renovación de la conducción general reutilización de la Marina Baja. Tramos en Alfaz del Pi, Altea y Villajoyosa

Presidencia del Consorcio para el Abastecimiento de Aguas y Saneamientos de la Marina Baja

Value
€301K
Closes
24 Nov 2026Closing date passed
Where
Spain
Contract
Works · Government

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Spain (Europe). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

This public works tender covers renovation of a general water reuse main (conducción general de reutilización) in the Marina Baja, in the municipalities of Alfaz del Pi, Altea and Villajoyosa. It suits construction contractors with pipeline and water infrastructure experience, with SME-scale capacity likely sufficient.

Summary by Raise Lens from the official notice · 22 Nov 2026Accurate?

This tender has closed

Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.

About this tender

The Presidencia del Consorcio para el Abastecimiento de Aguas y Saneamientos de la Marina Baja (Alicante, Valencian Community, Spain) is procuring renovation works on the general reclaimed-water (reutilización) main pipeline of the Marina Baja. The works cover sections located in Alfaz del Pi, Altea and Villajoyosa. File reference 32/2026. The contract type is Obras (works), with CPV codes covering general pipeline construction, earthworks machinery, civil engineering machinery, asphalt, pipelines and fittings, and pipeline reinstatement. The procedure is an open simplified procedure (Abierto simplificado), ordinary processing, with no EU funding. The base bidding budget and estimated contract value are both stated as 248,441.30 EUR excluding taxes. The page does not state the expected contract duration, the detailed technical specification, or the deliverables beyond the works description. These would be in the tender documents (pliego), which are listed on the platform but not reproduced in the page text.

Key requirements

  • Renovation works on a treated-water reuse pipeline in three sections
  • Work located in Alfaz del Pi, Altea and Villajoyosa (Alicante, Spain)
  • Public tender 32/2026, estimated value about €301K, closing 24 Nov 2026

CPV codes

Relevant sectors

Water tendersInfrastructure

How this compares

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourcePCSP (Spain)
Published3 Nov 2026
Closes24 Nov 2026, 14:00 UTC
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountrySpain
RegionEurope
CurrencyEUR
Value (USD)$331K
Budget range€248K
SubmissionElectronic submission via the State Public Sector Procurement Platform (Platafor
Last verified22 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)

Related tenders