Trebišov water main reconstruction, Bottova and five other streets
Original: Construction work for water and sewage pipelines – Trebišov - ulica Tabaková, Štúrova, Kollárova, Bottova, Jablonková, Tichá - stavebné úpravy vodovodu
Východoslovenská vodárenská spoločnosť, a.s.
- Value
- Not stated · check listing
- Closes
- 9 Dec 2026
- Where
- Slovakia
- Contract
- Works · Utility
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a utility covering construction and works. Delivery covers Slovakia and the European Union (Europe). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
A Slovak water utility is seeking a contractor to rehabilitate about 1,345 m of public water mains in Trebišov using trenchless micro-tunnelling, plus hydrants, valves, 81 service connections, pressure testing and disinfection. Bidders with trenchless pipe-works capacity or regional civil-engineering experience fit, and smaller firms could bid as subcontractors.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The contract covers reconstruction of selected sections of the public water supply network within the built-up area of Trebišov, on Bottova, Tabaková, Štúrova, Kollárova, Tichá and Jablonková streets. The works concern distribution branches B-2 to B-6, including branch B-5-6, with a total length of 1,345 m. New water pipe will be installed within the corridors of the existing routes using trenchless technology (controlled micro-tunnelling). The scope also includes installing underground hydrants, valves with ground boxes and covers, connections to existing water branches, and connection to the higher-level water network as set out in the project documentation. It further includes reconnecting 81 water service connections (odbočky/prípojky), including their connection to the reconstructed pipeline. After completion, the new pipeline must undergo pressure testing, flushing and disinfection, and affected surfaces must be restored to their original condition. Detailed requirements are in the tender documents. Contract duration is not stated on the page.
Key requirements
- Trenchless micro-tunnelling (riadené mikrotunelovanie) of about 1,345 m water mains in existing corridors
- Install underground hydrants, valves with ground boxes and covers, and connect 81 service branches
- Pressure testing, flushing and disinfection of new pipework, then restore surfaces to original state
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)