Skip to content
Raise Lens
Tender · TED (EU)Closed

Tree-cutting services – 220 kV transmission line corridor clearance

Original: Tree-cutting services – Почистване на сервитут на ВЛ 220 kV Оборище-Бенковски, обслужван от управление МЕР „Пловдив“, отдел Пазарджик

МРЕЖОВИ ЕКСПЛОАТАЦИОНЕН РАЙОН - ПЛОВДИВ

Value
Not stated · check listing
Closes
29 Sep 2026Closing date passed
Where
Bulgaria
Contract
Services · Utility

In context

This is a contract notice published by a utility covering services. Bids are invited through an open procedure. Delivery covers Bulgaria (Europe). It is classified under Grid Modernisation and Biodiversity and Nature against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures tree-cutting and vegetation clearance services along a 220 kV high-voltage transmission line corridor in Bulgaria to maintain electrical safety and regulatory compliance. Bidders should have forestry/arboriculture expertise, experience with utility right-of-way maintenance, and capability to work in mountainous/difficult terrain.

Summary by Raise Lens from the official notice · 23 Sept 2026Accurate?

This tender has closed

Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.

About this tender

Tree-cutting and vegetation clearance services for the power transmission line servitude zone of the 220 kV overhead line Oborişte-Benkovski, part of Bulgaria's transmission network managed by the Plovdiv Network Operating Area (MER Plovdiv), Pazardzhik Department. The line spans from pole 1 to pole 126 and was commissioned in 1965, connecting substations 'Aleko' and 'Kazichane'. Services include: removal of trees, shrubs and branches from the servitude across forest and non-forest territories (urbanized, agricultural, protected, damaged areas requiring restoration); cutting and hauling of timber to temporary storage (timber harvesting); transportation of cut wood biomass to servitude boundaries to ensure clearance between the outermost conductors. Work must comply with НТЕЕЦМ Article 765, Regulation No. 16 of 2004 on energy facility servitudes, Forest Law (ЗГ) and related regulatory requirements.

Key requirements

  • Removal of trees, shrubs, and branches within transmission line easement across forest and non-forest land
  • Extraction and transport of cut timber to temporary storage; compliance with forestry law and energy-infrastructure servitude regulations
  • Capability to work in mountainous/difficult terrain with limited road access and mechanization constraints

CPV codes

How this compares

About this sector

Grid modernisation covers transmission, distribution, smart meters, interconnectors and the software that balances a network with more variable supply. Funding comes as innovation calls for network operators and suppliers as well as large public tenders for equipment and works. Applicants are usually asked to show technical readiness and experience working with regulated network companies.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceTED (EU)
Published24 Aug 2026
Closes29 Sep 2026, 23:59 UTC
Buyer typeUtility
TypeServices
MethodOpen
DeliveryOn-site
CountryBulgaria
RegionEurope
CurrencyEUR
Last verified23 Sep 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)

Related tenders