UNDP-AFG-00928 Installation of Solar PV Systems in Herat and Farah Provinces
UNDP
- Value
- Not stated · check listing
- Closes
- 5 Dec 2026
- Where
- Afghanistan
- Contract
- Works · Un agency
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 27 Nov. This page is open to everyone now.
In context
This is a contract notice published by a UN agency covering construction and works. Delivery covers Afghanistan (Asia). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
UNDP is procuring the installation of solar PV systems in Herat and Farah provinces of Afghanistan. Suited to experienced solar installers and EPC contractors with local delivery capacity in Afghanistan, though UN procurement rules and security constraints apply.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
UNDP is inviting bids under ITB Ref No. UNDP-AFG-00928 for supporting cold storage facilities through the installation and operationalization of solar PV systems in Herat and Farah Provinces, Afghanistan. The procurement is issued under the General Conditions of Contract and the Schedule of Requirements set out in the Invitation to Bid. The ITB package includes a Scope of Work (Annex II), Bill of Quantities (Annex III), Technical Specifications (Annex I), Drawings (Annex IV), a Sample Work Plan (Annex V), and a Compliance Sheet (Annex VII). Environmental and safety documents are also provided for both provinces, including SESP and OHS documents for the Herat and Farah cold storage solarisation sites. A pre-bid virtual meeting is scheduled for 30 November 2026, 10:00 to 11:00 AM. The expected contract duration is not stated on the page.
Bidder eligibility
Bidders must register or log in to the UNDP supplier portal (Quantum system accessed via the UNGM link) and must not create a duplicate profile if one already exists. Bidders are expected to complete the Eligibility and Qualification form (Form F), Bidder Information form (Form D), and Counterparty Information form (Form J). Joint venture, consortium, or association bidders must complete Form E. Specific financial thresholds, prior experience requirements, and certifications are not stated on this page and would be set out in the ITB sections not reproduced here.
How bids are scored
The evaluation criteria are referenced as Section 4 of the ITB but are not disclosed on this page. No price/quality split or weightings are stated here.
Key requirements
- Installation of solar PV systems at sites in Herat and Farah provinces
- Local presence and delivery capacity in Afghanistan
- Compliance with UNDP procurement and safety requirements
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
Named in this notice. Check the official notice for the full list.
- Form A: Bid Confirmation
- Form C: Bid Submission
- Form D: Bidder Information
- Form E: Joint Venture/Consortium/Association Information (if applicable)
- Form F: Eligibility and Qualification
- Form G: Technical Bid
- Form H: Price Schedule
- Form I: Bid Security Form
- Form J: Counterparty Information Form
- Form K: Performance Security form
- Annex VII Compliance Sheet
- Annex III Bill of Quantity and Annex V Sample work plan