Utskifting av ventilasjonsaggregater 36.01 og 36.02 2026 Tender

Original: Utskifting av ventilasjonsaggregater 36.01 og 36.02 – Atlanterhavsbadet

Kristiansund kommune

Value
NOK 7.2M
Closes
14 Dec 2026
 
Where
Norway
Contract
Mixed · Government

Free accounts: 1 official link a month · Pro: every link

Pro early accessIn public feeds and alerts from 29 Nov. This page is open to everyone now.

Raise Lens Pro

With Pro you could have had 22 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 22 Nov 202622 days to prepare
Found today · 24 Nov 202620 days to prepare

In context

This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Norway (Europe). It is classified under Heating and Cooling, Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Kristiansund kommune is procuring design, supply, installation and commissioning of two replacement ventilation and dehumidification units (36.01 and 36.02) at the Atlanterhavsbadet pool, with a focus on energy efficiency, corrosion-resistant materials and phased works during operation. Suited to HVAC contractors or suppliers with experience in demanding indoor pool environments and an ability to deliver integrated design-to-commissioning work.

Summary by Raise Lens from the official notice · 23 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Kristiansund kommune, through Eiendomsdrift, is replacing two existing ventilation and dehumidification air handling units, designated 36.01 and 36.02, at Atlanterhavsbadet (Vågeveien 4, 6501 Kristiansund N). The units date from 2004 and are worn. The purpose is to secure stable operation, air quality and temperature and humidity control in the pool areas, improve energy efficiency, and install units suited to a demanding, humid and chlorinated pool environment with corrosion protection. The scope is a single integrated unit delivery covering design and sizing, supply, dismantling of the existing units, transport in, installation, commissioning, documentation and training. Deliverables include complete units with internal controls, documentation of capacity, SFP value, temperature efficiency, heat recovery, refrigerant, materials and corrosion protection, module division and installation principles, coordination with existing ductwork, piping, electrical, automation and SD systems within agreed interfaces, regulation and functional testing, FDV documentation, and operator training. Larger duct adaptations and piping, electrical and building works outside the supplier's defined interfaces are normally handled by the buyer's framework partners or other contractors. The supplier must also produce an implementation plan covering sequence, expected downtime and measures to maintain operation and safety. Work must be phased, replacing unit 36.01 first and then 36.02, because the facility must keep normal operation as far as possible. The indicative contract period runs from 12.01.2027 to 12.04.2027, with six months of trial operation before final handover. The procedure is an open tender under the Norwegian Procurement Regulations (FOR-2016-08-12-974). The buyer reserves the right to negotiate with one or more bidders, and clarifications may be made.

Bidder eligibility

Not disclosed in the notice text. Selection criteria (section 5.1.9) are empty on the page, and the grounds for exclusion are referenced only to the procurement document. Bidders should consult the konkurransegrunnlag (part II, including II.30 Kravspesifikasjon VVS) for technical requirements, responsibility allocation and documentation requirements. Multiple bids from one bidder are not permitted. Bids may be submitted in Norwegian. Contract performance terms refer to the procurement document; eFaktura is mandatory.

How bids are scored

Award is based on three weighted criteria: (1) Price, 50%, based on the total bid sum excluding VAT for items 1.1–1.3 in the price schedule; options and other items are excluded from evaluation. (2) Environmental and energy performance, 30%, based on SFP, heat recovery temperature efficiency and the climate impact of the refrigerant, per the evaluation model in the procurement document. (3) Quality and delivery, 20%, assessing the implementation plan's phased replacement, realistic schedule, handling of downtime, temporary ventilation needs and coordination with other actors.

Key requirements

  • Design, dimensioning, supply, dismantling, transport, installation and commissioning of two ventilation/dehumidification units
  • Documentation of capacity, SFP value, temperature efficiency, heat recovery, refrigerant and materials
  • Corrosion-resistant construction for chlorinated pool environments, with phased works to keep the pool operating

Procurement contact

The notice names a procurement contact for clarification questions.

CPV codes

Relevant sectors

How this compares

About this sector

Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceDoffin (Norway)
Published22 Nov 2026
Closes14 Dec 2026, 12:00 UTC
Buyer typeGovernment
TypeMixed
DeliveryOn-site
CountryNorway
RegionEurope
CurrencyNOK
Value (USD)$677K
SubmissionMandatory electronic submission via the Hyyr platform (https://hyyr.no/procureme
Last verified23 Nov 2026

Documents to prepare

Named in this notice. Check the official notice for the full list.

  • Price schedule filled in within Hyyr (items 1.1–1.3)
  • Implementation plan (gjennomføringsplan) covering sequence, expected downtime, measures to maintain operation and…
  • Documentation of capacity, SFP value, temperature efficiency, heat recovery, refrigerant and materials
  • Documentation of corrosion protection
  • Documentation of module division, transport route, inntransport, service area and installation principles
  • Environmental schedule (miljøskjema)