Skip to content
Raise Lens
Tender · BOAMP (France)

Valve equipment works on Rouffiac dam drainage device 2027 Tender

Original: Travaux D'equipement De Vannes Sur Le Dispositif De Vidange Du Barrage De Rouffiac

Département de la Dordogne

Value
Not stated · check listing
Closes
2 Feb 2027
 
Where
France
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Pro early accessIn public feeds and alerts from 2 Dec. This page is open to everyone now.

In context

This is a contract notice published by a government body covering construction and works. Delivery covers France (Europe). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

The Département de la Dordogne is procuring works to equip the Rouffiac dam's drainage system with an upstream guard valve, replace the downstream drain valve, and build a bypass that maintains minimum downstream release flow. It suits construction and hydraulic works contractors with dam or water-infrastructure experience, with Lot 2 split into a firm bypass tranche and an optional valve-replacement tranche.

Summary by Raise Lens from the official notice · 25 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Les travaux sur le dispositif de vidange consistent à l'équipement d'une vanne de garde (amont), au remplacement de la vanne de vidange (aval) et d'adaptation avec la création d'une dérivation pour le maintien du débit minimum de restitution. Le lot N° 2 fait l'objet d'un fractionnement en tranches au sens des articles R. 2113-4 à R.2113-6 du code de la commande publique. Il comporte une tranche ferme et une tranche optionnelle désignée ci-après Lot 2 Tranche N°1 Ferme: Réalisation d'un bypass pour le débit de restitution minimum Lot 2 Tranche N°2 Optionnelle: Remplacement de la vanne de vidange. Le délai limite d'affermissement de la tranche N°2 optionnelle à compter du début d'exécution du marché est de 24 mois Descripteurs : Barrage

Key requirements

  • Equip upstream guard valve on the dam drainage device
  • Replace downstream drain valve and adapt the outlet works
  • Lot 2 firm tranche: create bypass to maintain minimum release flow
  • Lot 2 optional tranche: valve replacement, firmed up within 24 months of start

CPV codes

Relevant sectors

Water tendersInfrastructure

How this compares

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceBOAMP (France)
Published24 Nov 2026
Closes2 Feb 2027
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountryFrance
RegionEurope

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)