Tree-cutting services – 110 kV transmission line easement clearance Nestan
Original: Tree-cutting services – Почистване на сервитут на ВЛ 110 kV Настан, обслужван от Управление МЕР Пловдив, отдел Смолян
МРЕЖОВИ ЕКСПЛОАТАЦИОНЕН РАЙОН - ПЛОВДИВ
- Value
- Not stated · check listing
- Closes
- 29 Sep 2026Closing date passed
- Where
- Bulgaria
- Contract
- Services · Utility
In context
This is a contract notice published by a utility covering services. Delivery covers Bulgaria (Europe). It is classified under Grid Modernisation and Biodiversity and Nature against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures tree-cutting and vegetation clearance services along a 110 kV high-voltage transmission line corridor in Bulgaria to maintain electrical safety and regulatory compliance. Bidders should be forestry/arboricultural contractors experienced in utility right-of-way maintenance, terrain access, and compliance with Bulgarian forest and energy regulations.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Tree-cutting and vegetation clearance services for the right-of-way (servitude zone) of a 110 kV overhead power line (ВЛ 110 kV Настан) connecting hydroelectric plants Devin and Tsankov Kamak. The line, commissioned in 2012, is operated by Network Operations Department Plovdiv, Smolyan branch. Services include removal of trees, shrubs, and branches within the servitude across forest and non-forest territories (urban, agricultural, protected, and restoration areas); cutting and extraction of timber to temporary storage; and clearance of cut material to the servitude boundaries. The terrain includes mountainous and difficult-access areas where mechanical equipment access is constrained. Works must comply with technical standards and Bulgarian forest and energy regulations.
Bidder eligibility
Not explicitly stated in provided text. Standard requirements for Bulgarian utility contractors likely apply (company registration, technical capacity for forestry/utility work, insurance, compliance with environmental and safety regulations).
How bids are scored
Not specified in provided text.
Key requirements
- Removal of trees, shrubs, and branches within transmission line easement across forest and non-forest land
- Compliance with Bulgarian forest law (ЗГ), energy regulations (НТЕЕЦМ), and easement ordinance (Наредба № 16/2004)
- Access to difficult terrain (mountain/broken ground, limited road access); mechanical equipment may be constrained
- Extraction and transport of cut timber to temporary storage; clearance of debris from easement corridor
- Work on 110 kV Nestan line (operational since 2012, connects two hydroelectric plants) managed by MEP Plovdiv, Smolyan office
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Grid modernisation covers transmission, distribution, smart meters, interconnectors and the software that balances a network with more variable supply. Funding comes as innovation calls for network operators and suppliers as well as large public tenders for equipment and works. Applicants are usually asked to show technical readiness and experience working with regulated network companies.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)