Ventilation and air-conditioning work – New town hall Herzebrock-Clarholz – Trade 09 ventilation
Original: Ventilation and air-conditioning installation work – Neubau Rathaus Herzebrock-Clarholz - 09 Gewerk Lüftungsarbeiten
Herzebrock-Clarholz
- Value
- Not stated · check listing
- Closes
- 25 Nov 2026
- Where
- Germany
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Germany (Europe). It is classified under Heating and Cooling against the sustainability taxonomy rather than matched on keywords.
Summary
This German tender covers the ventilation trade lot for the new town hall in Herzebrock-Clarholz, including an outdoor supply/exhaust air unit (7,000 m³/h), ductwork, variable air volume controllers, fire dampers and split cooling for three server rooms. It suits HVAC installation contractors and SMEs in the building-services trade rather than sustainability-focused suppliers, since the description names no energy-efficiency or low-carbon standards.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
This notice concerns the ventilation and air-conditioning installation works (trade package 09, "Gewerk Lüftungsarbeiten") for the new town hall (Neubau Rathaus) in Herzebrock-Clarholz. The page text describes the scope but does not state the contract duration. The scope includes a central supply and exhaust air unit with a capacity of 7,000 m³/h, installed outdoors, which ventilates the offices, the council chamber and ancillary rooms. Air distribution uses approximately 1,000 m² of sheet-metal ductwork and fittings and 600 m of round duct. Variable air volume regulators are installed at the floor outlets. Fire dampers, some with smoke-detection release devices, are to be installed according to the fire protection concept. Three server rooms are to be cooled by split refrigeration systems.
Key requirements
- Outdoor-mounted central supply/exhaust air unit rated 7,000 m³/h
- About 1,000 m² sheet metal ductwork and 600 m round duct with fittings
- Fire dampers, some with smoke release, per fire protection concept; split cooling for 3 server rooms
Relevant sectors
How this compares
About this sector
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)