Waste disposal site environmental upgrade and expansion works – Cephalonia
Original: Waste disposal site construction work – ΕΡΓΑ ΠΕΡΙΒΑΛΛΟΝΤΙΚΗΣ ΑΝΑΒΑΘΜΙΣΗΣ & ΕΠΕΚΤΑΣΗΣ ΧΥΤΥ-Ο.Ε.Δ.Α. ΚΕΦΑΛΟΝΙΑΣ
ΦΟΔΣΑ ΙΟΝΙΩΝ ΝΗΣΩΝ Α.Ε.
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- Greece
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Greece and the European Union (Europe). It is classified under Waste Reduction and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures construction, infrastructure upgrade, and 6-year operational services for an integrated waste disposal and organic-waste processing facility on Cephalonia, Greece, including landfill cell expansion, leachate management, environmental monitoring systems, and composting-line development. Bidders should have experience in waste-infrastructure engineering, environmental systems integration, and multi-year facility operations.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Construction and environmental upgrade works for a waste disposal site (landfill) in Cephalonia, Greece. The project encompasses: (1) creation of an intermediate cell between the old first cell and operating second cell, extending site lifespan by over 17 years; (2) development of leachate management infrastructure including collection networks from the new base and sealed first cell surface; (3) improvement of existing and construction of new site infrastructure; (4) environmental monitoring works and remote monitoring systems; (5) upgrade of the leachate treatment unit with addition of prefabricated ultrafiltration and reverse osmosis units and conversion of existing SBR unit; (6) upgrade of existing preprocessing and composting unit including necessary infrastructure (reception, shelter) and processing equipment (magnets, manual sorting) and addition of composting line for separately collected organic waste as per approved waste management plan. The contract includes 6 years of operational management of the completed works.
Key requirements
- Design and construct intermediate landfill cell to extend site life >17 years
- Develop leachate collection and treatment infrastructure including ultrafiltration and reverse-osmosis units
- Upgrade pre-processing and composting facility with source-separated organic-waste processing line
- Install environmental monitoring and remote-telemetry systems for operational oversight
- Operate completed facility for 6-year concession period
Relevant sectors
How this compares
About this sector
About this sector
Waste reduction funding covers prevention, collection, sorting, recycling and recovery of municipal, commercial and industrial waste. Much of the activity is public procurement by local and regional authorities, alongside grants for new treatment technology. Bidders are typically assessed on service capacity, environmental permits and track record with comparable contracts.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)