Skip to content
Raise Lens
Tender · TED (EU)

Waste preprocessing, sorting, and loading services – Szeged regional facility

Original: Refuse and waste related services – Hulladék előkezelés, osztályozása, rakodása Szeged

Szegedi Hulladékgazdálkodási Nonprofit Kft.

Value
Not stated · check listing
Closes
Not stated · check listing
Where
Hungary
Contract
Services · Soe

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice published by a state-owned enterprise covering services. Delivery covers Hungary (Europe). It is classified under Waste Reduction and Circular Economy against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures waste handling, sorting, and loading services at a regional waste management facility in Szeged, Hungary, covering construction/demolition waste and compostable materials. Bidders must have operational capacity for on-site material handling, transport, and waste processing equipment.

Summary by Raise Lens from the official notice · 12 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Waste pre-treatment, classification, and loading services at the Szeged Regional Waste Management Centre (Szegedi Hulladékgazdálkodási Nonprofit Kft.), located at Komposztáló út. The contractor shall provide on-site transport, handling, and loading of waste classified under regulation 72/2013 (VIII.27.) VM. Services span six task groups: (1) On-site loading operations at the construction-demolition waste processing facility (ÉBH) handling up to 22,500 tonnes/year (max 120 tonnes/day) and composting facility handling up to 7,500 tonnes/year (max 40 tonnes/day); (2) On-site transport operations at ÉBH facility (up to 50,000 tonnes/year, max 200 tonnes/day) and composting facility (up to 7,500 tonnes/year, max 40 tonnes/day); (3) Pre-treatment of oversized concrete and reinforced concrete pieces (crushing, crushing) up to 5,000 tonnes/year; (4) Manual extraction of steel reinforcements up to 150 tonnes/year; (5) Mechanical crushing and processing of mixed construction/demolition waste and asphalt waste up to 12,000 tonnes/year; (6) Manual sorting and treatment of specific waste streams up to 2,500 tonnes/year. The buyer commits to minimum call-off of 70% of contracted volumes.

Bidder eligibility

Bidders must be classified according to regulation 72/2013 (VIII.27.) VM for waste handling activities. Specific technical and operational capability to handle defined waste streams (waste codes 17 xx xx, 19 xx xx, 02 xx xx, 03 xx xx, 20 xx xx) is required. Contractor must demonstrate capacity for the specified daily and annual tonnage targets for each task group and possess necessary equipment and personnel for loading, transport, and pre-treatment operations at the Szeged facility.

Lots

  • Lot 1: On-site loading operations (ÉBH facility)

    Loading of construction-demolition waste and metal separation; annual max 22,500 tonnes (120 tonnes/day); composting facility waste annual max 7,500 tonnes (40 tonnes/day)

  • Lot 2: On-site transport operations

    Transport of waste at ÉBH facility annual max 50,000 tonnes (200 tonnes/day) and composting facility annual max 7,500 tonnes (40 tonnes/day)

  • Lot 3: Pre-treatment of oversized concrete and reinforced concrete pieces

    Crushing and crushing of concrete waste codes 17 01 01, 17 01 07, 17 09 04, 17 05 04; annual max 5,000 tonnes (26 tonnes/day)

  • Lot 4: Manual extraction of steel reinforcements

    Hand-removal of steel inserts from waste codes 17 01 01, 17 01 07, 17 05 04, 17 09 04; annual max 150 tonnes (900 kg/day)

  • Lot 5: Mechanical crushing and processing of mixed construction/demolition and asphalt waste

    Processing of waste codes 17 01 01, 17 01 02, 17 01 03, 17 01 07, 17 03 02, 17 05 04, 17 08 02, 17 09 04; annual max 12,000 tonnes (62 tonnes/day)

  • Lot 6: Manual sorting and treatment of waste streams 17 05 04 and 17 09 04

    Manual sorting and handling of waste codes 17 05 04 and 17 09 04; annual max 2,500 tonnes (13 tonnes/day)

Key requirements

  • On-site loading and material handling for construction/demolition waste (max 22,500 tonnes/year, 120 tonnes/day)
  • On-site loading and material handling for compostable waste (max 7,500 tonnes/year, 40 tonnes/day)
  • Internal facility transport of processed waste and products (max 50,000 tonnes/year for construction waste, 200 tonnes/day)
  • Compliance with EU waste classification (72/2013 VM regulation)
  • Equipment and labour for sorting, preprocessing, and material movement across facility zones

CPV codes

How this compares

About this sector

Waste reduction funding covers prevention, collection, sorting, recycling and recovery of municipal, commercial and industrial waste. Much of the activity is public procurement by local and regional authorities, alongside grants for new treatment technology. Bidders are typically assessed on service capacity, environmental permits and track record with comparable contracts.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published24 Jun 2026
Buyer typeSoe
TypeServices
DeliveryOn-site
CountryHungary
RegionEurope
Last verified12 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)