Waste-treatment plant construction work – Design and execution of works for construction of the Biljane Donje Waste Management Center
Original: Waste-treatment plant construction work – Projektiranje i izvođenje radova na izgradnji Centra za gospodarenje otpadom Biljane Donje
EKO d.o.o.
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- Croatia
- Contract
- Works · Corporate
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a corporate buyer covering construction and works. Delivery covers Croatia and the European Union (Europe). It is classified under Waste Reduction, Circular Economy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures design and construction of a comprehensive waste management centre in Croatia, including mechanical-biological treatment, composting, recycling facilities, and landfills for mixed municipal, industrial, and construction waste. Bidders should be experienced waste infrastructure contractors with expertise in FIDIC-compliant large-scale environmental engineering projects.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Design and construction of the Waste Management Centre "Biljane Donje" located in Benkovac, Zadar County, Republic of Croatia, covering approximately 46.3 hectares. The facility will accept mixed municipal, industrial, and construction waste from Zadar County and parts of Lika-Senja County. The centre comprises 12 zones including: administrative building, open-type recycling yard, transport centre, mechanical-biological treatment plant (MBO) for mixed municipal waste processing with 75,000 tonnes/year capacity and composting facility with 10,000 tonnes/year capacity for bio-waste, non-hazardous waste landfill (12 ha), inert waste landfill (5.9 ha), covered storage, wastewater and landfill gas treatment facilities, construction waste recycling area, entrance/exit zones, internal infrastructure and roads. The project shall be executed according to FIDIC General and Particular Conditions of Contract for Works of Civil Engineering Construction (1999 Yellow Book, Croatian translation 2014 edition).
Key requirements
- Design and construction of waste management centre (46.3 ha) compliant with FIDIC Yellow Book conditions (1999 edition, Croatian translation 2014)
- Mechanical-biological treatment (MBO) plant for mixed municipal waste with 75,000 tonne/year capacity using aerobic biosludge technology to produce SRF (solid recovered fuel)
- Aerobic composting facility for biowaste (10,000 tonne/year) and structural material processing (3,000 tonne/year)
- Infrastructure zones: administrative building, open recycling yard, transport centre, non-hazardous waste landfill (12 ha), inert waste landfill (5.9 ha), covered storage, wastewater treatment, landfill gas treatment, construction waste recycling, access roads and internal infrastructure
- Serves Zadar County and parts of Lika-Senj County (Gospić, Novalja municipalities)
Relevant sectors
How this compares
About this sector
About this sector
Waste reduction funding covers prevention, collection, sorting, recycling and recovery of municipal, commercial and industrial waste. Much of the activity is public procurement by local and regional authorities, alongside grants for new treatment technology. Bidders are typically assessed on service capacity, environmental permits and track record with comparable contracts.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)