Skip to content
Raise Lens
Tender · TED (EU)

Wastewater treatment plant, network and road construction in Dabas

Original: Sewage-treatment plant construction work – Szennyvíztisztító telep, hálózat, útépítés Dabason

Dabas Város Önkormányzata

Value
Not stated · check listing
Closes
3 Dec 2026
 
Where
Hungary
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Pro early accessIn public feeds and alerts from 26 Nov. This page is open to everyone now.

Raise Lens Pro

With Pro you could have had 14 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 19 Nov 202614 days to prepare
Found today · 24 Nov 20269 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Hungary (Europe). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

The Dabas municipality is procuring a works contract to build a new SBR wastewater treatment plant, a sewer network, a poplar irrigation field for treated effluent, and road works, followed by at least six months of trial operation and warranty services. It suits experienced Hungarian civil and water-infrastructure contractors able to deliver a large FIDIC Red Book project.

Summary by Raise Lens from the official notice · 23 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The buyer, Dabas Város Önkormányzata, is procuring the development of Dabas town's sewage collection and treatment system under a design-and-build contract. The scope includes a minimum 6-month trial operation and performance of warranty-period obligations during the defect liability period. The detailed design was completed under the KEHOP-2.1.3-15-2022-00105 funding agreement, and the contract follows the FIDIC Red Book model. A preliminary environmental review concluded that a full environmental impact assessment is not required (PE/KTHF/00172-15/2024). Part 1 covers the construction of a new greenfield sewage treatment plant on plot 0148/5-8 outside the built-up area of Dabas, replacing the 1975 plant. The new plant has an organic capacity of 30,670 PE and a treatment capacity of 3,100 m³/day, using SBR technology. It also covers construction and rehabilitation of a poplar-plantation irrigation field of 49 ha in total (21.5 ha existing plus 27.5 ha new), including a 10,904 m pressure irrigation pipe network, about 100,660 m of drainage pipe, 25,000 poplar trees, four groundwater monitoring wells, and associated valve and distribution chambers. Part 1 also includes a sewer network of about 5,920 m, the connection of four existing pressure mains to the new plant, a twin pressure main to the new plant, new terminal pumping chambers and governor chambers, and a potable water line for the plant. Pressure mains NY-3 to NY-8 total about 4,957 m and are included in the bid scope, with the design reference 2023/T/59 V2. The water-use permits are in place for the plant (30414/3915-24/2024) and the network elements (30414/348-12/2025). The building permit for the plant is PE/ETDR-EP/10579-22/2026. The source notice states a closing date of 3 December 2026. The contract duration beyond the trial operation and warranty period is not stated in the provided text.

Lots

  • Lot 1: Szennyvíztisztító telep és nyárfás öntözőtelep építése, hálózat építési feladatok (Part 1: treatment plant, poplar irrigation field and network works)

    Construction of the new SBR sewage treatment plant (30,670 PE, 3,100 m³/day) on plot 0148/5-8; construction and rehabilitation of the 49 ha poplar irrigation field, including pressure irrigation pipes (10,904 m), drainage pipes (100,660 m), 25,000 trees and 4 monitoring wells; sewer network of about 5,920 m with valve and distribution chambers; connection of existing pressure mains to the new plant, a twin pressure main, terminal pumping and governor chambers (1-3), and pressure mains NY-3 to NY-8 totalling about 4,957 m; and a potable water line for the plant.

Key requirements

  • Build new SBR wastewater treatment plant with 3,100 m3/day capacity and 30,670 LEÉ organic load
  • Construct poplar irrigation field, sewer network and road works under FIDIC Red Book contract
  • Provide minimum six-month trial operation and warranty-period services

CPV codes

Relevant sectors

Water tendersInfrastructure

How this compares

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published19 Nov 2026
Closes3 Dec 2026
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountryHungary
RegionEurope
Last verified23 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)

Related tenders