This tender closed on 15 September 2026. The deadline passed 71 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Wastewater treatment plant redesign: alternatives, environmental studies, preliminary design
Original: Servicio de redacción del estudio de alternativas, estudios ambientales y anteproyecto de la remodelación de la E.D.A.R. Cerro del Águila (Fuengirola - Mijas) para ACOSOL, S.A.
Consejería delegada de ACOSOL, S.A.U.
- Value
- €593K
- Closes
- 15 Sep 2026Closing date passed
- Where
- Spain
- Contract
- Consulting · Government
In context
This is a contract notice published by a government body covering consulting. Bids are invited through an open procedure. Delivery covers Spain and the European Union (Europe). It is classified under Sustainable Buildings, Water and Climate Adaptation against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures engineering and environmental studies for the redesign and modernization of a wastewater treatment plant (EDAR) in southern Spain, including alternatives analysis, environmental impact assessment, and preliminary design. Bidders should be engineering consultancies or multidisciplinary firms with expertise in water infrastructure, environmental assessment, and civil engineering design.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Service for the preparation of an alternatives study, environmental studies, and preliminary design for the remodeling of the E.D.A.R. Cerro del Águila wastewater treatment facility located in Fuengirola-Mijas. The contract involves engineering services including consultation on civil infrastructure, technical design for civil engineering works, and preliminary project development (anteproyecto). The scope includes environmental assessment and feasibility analysis for the facility's renovation.
Key requirements
- Alternatives analysis and feasibility study for EDAR Cerro del Águila modernization
- Environmental impact assessment and environmental studies
- Preliminary design (anteproyecto) for wastewater treatment plant renovation
- Compliance with Spanish and EU water/environmental regulations
Relevant sectors
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)