Water supply pipeline from metropolitan reservoir, Bétera 2026 Tender
Original: Conducción de alimentación desde el depósito metropolitano
Pleno del Ayuntamiento de Bétera
- Value
- €5.8M
- Closes
- 28 Dec 2026
- Where
- Spain
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Spain and the European Union (Europe). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures the construction of a water supply pipeline carrying supply from the metropolitan reservoir to the municipality of Bétera. It suits established civil-engineering contractors with pipeline works experience and the financial capacity for a €4.8M public works contract.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Public works contract for the construction of a water supply pipeline ('Conducción de alimentación desde el depósito metropolitano') for the municipality of Bétera (Valencia, Spain), tendered by the Pleno del Ayuntamiento de Bétera under file 9815/2025. The contract type is Obras (works). The CPV codes are 45231300 (construction of water and wastewater pipelines) and 45232150 (works related to water distribution pipelines). The procedure is open (Abierto) with ordinary processing (Ordinaria). No EU funding applies. Offers are submitted electronically through the State Contracting Platform. The published documents include the Bc3 cost file, a justification report (memoria justificativa), the file approval document, and the initiation agreement. A later Junta de Gobierno Local (JGL) certificate covers a clarification of the classification and an extension of the offer deadline. The page indicates the tender has been amended (rectificación de anuncio and rectificación de pliego), so the current documents should be checked on the platform. The page does not state the contract duration, scope of works in detail, or execution milestones. These would be found in the technical specifications (pliego) and project documentation.
Key requirements
- Construction of water supply pipeline from metropolitan reservoir (CPV 45231300, 45232150)
- Estimated budget of about €4.8M (tender value €5.8M)
- Civil works requiring contractor solvency and classification under Spanish public procurement rules
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)