Water supply system reconstruction – Učka region pipelines Tender
Original: Construction work for water and sewage pipelines – REKONSTRUKCIJA VODOOPSKRBOG SUSTAVA UČKA
LIBURNIJSKE VODE d. o. o.
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- Croatia
- Contract
- Works · Utility
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a utility covering construction and works. Delivery covers Croatia (Europe). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures reconstruction of water supply infrastructure including intake points, collection chambers, and storage reservoirs in Croatia, with associated electrical and civil works. Bidders should be construction firms or water-utility contractors experienced in pipeline systems, water treatment facilities, and integrated utility infrastructure.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Construction work for water and sewage pipelines reconstruction within the Učka water supply system. The contract encompasses: (1) reconstruction of water intakes "Mala Učka" and "Vela Učka" including replacement of fittings and equipment, and necessary electrical installation reconstruction; (2) reconstruction of the collection chamber SK Rečina and shut-off chamber PK Sejnice involving installation/replacement of water fittings, electrical and low-voltage installations, and associated construction works for new equipment installation and renovation of existing building parts; (3) reconstruction of water reservoir VS Tunel Učka including changes to special fittings and equipment, replacement of metal work components, and building and masonry renovation; (4) connection of water facilities to the low-voltage system managed by Liburnijske vode. The contract also includes preparation of detailed design projects, documentation of as-built conditions, performance of tests, and correction of latent defects during warranty period. Construction is carried out based on main projects requiring no building permit.
Key requirements
- Reconstruction of water intake points (Mala Učka and Vela Učka) with equipment and armature replacement
- Reconstruction of collection chamber (SK Rečina) and blocking chamber (PK Sejnice) with valve installation and electrical/NUS integration
- Reconstruction of water storage reservoir (VS Tunel Učka) including equipment replacement and structural renovation
- Connection of water infrastructure objects to NUS system managed by Liburnijske vode
- Preparation of detailed design documentation, as-built surveys, testing protocols, and warranty-period defect remediation
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)