Waterway construction on Elbląg river, P1 to Port section 2026 Tender
Original: Construction work for waterways – Tor wodny na rzece Elbląg na odcinku od punktu P1 do punktu Port
Dyrektor Urzędu Morskiego w Gdyni
- Value
- Not stated · check listing
- Closes
- 25 Nov 2026
- Where
- Poland
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Bids are invited through an open procedure. Delivery covers Poland (Europe). It is classified under Water, Climate Adaptation and Waste Reduction and 1 other against the sustainability taxonomy rather than matched on keywords.
Summary
A Polish maritime office is procuring construction of a navigable waterway on the Elbląg river between points P1 and Port, including channel lining, dredging, turning basin and navigation marking. Suited to established hydrotechnical construction contractors, with SMEs able to bid as subcontractors.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Dyrektor Urzędu Morskiego w Gdyni (Maritime Office in Gdynia) is procuring construction works for a hydrotechnical waterway on the Elbląg river, covering the section from point P1 to point Port. The scope is the construction of a waterway infrastructure, including channel lining (obudowa toru), dredging works (prace czerpalne), and navigational marking for the future fairway and turning basin (obrotnica). The works are described in detailed technical documentation attached to the SWZ (Specyfikacja Warunków Zamówienia) as Annex 1. This documentation includes the construction design (site development design, architectural-construction design covering the Elbląg river and the turning basin, technical design, and technical specifications for execution and acceptance of construction works), geological-engineering documentation, a ferromagnetic survey report, a navigational analysis with a navigational marking design, and a water-law operating document. The documentation also lists the required permits and decisions, including an environmental conditions decision (ref. WOOŚ.420.18.2025.AZ.17, with a 27.03.2026 decision by the Regional Environmental Protection Director in Olsztyn), a location decision, a permit for artificial structures in Polish maritime areas, a regional heritage conservator permit (ZW-124/176/2025 of 16.04.2026), and a derogation decision (WIN-II.7850.5.1.2026.KKO of 27.02.2026). Works must follow the Scope of Work Description (OPZ, Annex 1.1 to SWZ) and the environmental decision. Contractual conditions and contractor obligations are set out in the draft contract (Annex 2 to SWZ). The contract duration is not stated in the provided text.
Key requirements
- Construct waterway with channel lining, dredging and turning basin per technical documentation
- Comply with environmental decision WOOŚ.420.18.2025.AZ.17 and conservator permits
- Install navigation marking per the navigation analysis and project
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)