Works for 1500 kW grid connection for Gavà EV charging station

Original: Cimalsa ha licitat una concessió d’obres per a la construcció d’una estació de recàrrega ultra ràpida de vehicles elèctrics a l’àrea de servei de Gavà en sentit Barcelona, ubicada a la C-32, segons encàrrec de la Secretaria de Transports i Mobilitat del Departament de Territori. Per poder desenvolupar la concessió és necessari que CIMALSA executi les obres necessàries per disposar d’una escomesa elèctrica de 1500 kW, que inclouen una nova línia elèctrica de Mitja tensió soterrada, nou centre de mesura i nou centre de transformació, objecte d’aquesta licitació.

Centrals i Infraestructures per a la Mobilitat i les Activitats Logístiques, SAU (CIMALSA)

Value
€210K
Closes
12 Jan 2027
 
Where
Spain
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 66 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 7 Nov 202666 days to prepare
Found today · 24 Nov 202649 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Spain (Europe). It is classified under Electric Mobility and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures the construction of a 1500 kW electrical connection for an ultra-fast EV charging station at the Gavà service area on the C-32, including a new underground medium-voltage line, metering centre and transformer substation. It suits electrical construction contractors with medium-voltage works experience who can deliver a single-lot, SME-scale works contract.

Summary by Raise Lens from the official notice · 8 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

CIMALSA, a public infrastructure company, is procuring the execution of works for a new 25 kV underground electrical line, a new metering centre and a new transformer centre. These works will provide a 1,500 kW electricity connection for a new ultra-fast electric vehicle charging station at the Gavà Sud service area on the C-32 motorway (Barcelona direction). The works are commissioned by the Secretaria de Transports i Mobilitat of the Departament de Territori, and are a prerequisite for developing the charging station concession. The contract is a works project (CPV 45000000-7 Construction work, with secondary CPV 51110000-6 Installation services of electrical equipment) executed on a unit-price basis, with no price revision foreseen. It is not divided into lots, with the justification that splitting the scope would hinder technical coordination and implementation. The expected duration is 6 months, with a possible extension of up to 6 months if delays are attributable to the electricity distribution company. Modifications are foreseen as set out in the tender documents. The offer validity period is 4 months.

Bidder eligibility

Economic and financial solvency is required under the criterion 'Others', and technical solvency is also required under the criterion 'Others'. The specific thresholds and accepted evidence are not stated on the notice page and should be checked in the Plec de clàusules administratives (PCA) and Plec de prescripcions tècniques (PPT). The contract is not restricted to special employment centres or insertion companies, and it is not reserved for a specific profession. A definitive guarantee of 6% of contract value is required. No provisional guarantee is required.

How bids are scored

Multi-criteria award with a total of 100 points, split as follows: price 56 points (automatic evaluation); other automatic evaluation criteria 16 points; and criteria subject to value judgment (qualitative) 28 points. Bids are evaluated in Sobre C, with the opening scheduled for 25/01/2027 at 12:15 at CIMALSA BCN.

Key requirements

  • Construct new underground medium-voltage electrical line
  • Install new metering centre and transformer substation
  • Deliver 1500 kW connection enabling ultra-fast EV charging at Gavà

Procurement contact

The notice names a procurement contact for clarification questions.

CPV codes

Relevant sectors

E-Mobility tendersInfrastructure

How this compares

About this sector

Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourcePCSP regional platforms (Spain)
Published6 Nov 2026
Closes12 Jan 2027, 12:00 UTC
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountrySpain
RegionEurope
CurrencyEUR
Value (USD)$231K
Budget range€277K
SubmissionElectronic submission via the Plataforma de Serveis de Contractació Pública (Cat
Last verified8 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)