Skip to content
Raise Lens
Tender · TED (EU)

Works for biomass heat and power generation from renewable sources project

Original: Works for complete or part construction and civil engineering work – ENLJ-VOD-SP-170/26 – »Projekt proizvodnje toplote in električne energije iz obnovljivih virov – BIOMASA«

JAVNO PODJETJE ENERGETIKA LJUBLJANA d.o.o.

Value
€30M
Closes
Not stated · check listing
Where
Slovenia
Contract
Works · Utility

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice published by a utility covering construction and works. Bids are invited through an open procedure. Delivery covers Slovenia and the European Union (Europe). It is classified under Renewable Energy, Heating and Cooling and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

EPC contract for design, procurement, and construction of a 90 MWt biomass-fired combined heat and power plant with steam turbine and district heating integration, replacing existing coal/fossil infrastructure. Bidder must be a large engineering-procurement-construction firm with expertise in biomass boiler systems, steam turbines, power generation, and district heating networks.

Summary by Raise Lens from the official notice · 18 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

EPC (Engineering, Procurement, Construction) turnkey project for biomass-based heat and electricity production facility within Javno Podjetje Energetika Ljubljana. The scope encompasses complete engineering, design (PZI, PID, DZO), technical and regulatory documentation, site preparation, demolition of existing boiler/electrical/turbine equipment from blocks 1 and 2, supply and installation of new biomass boiler equipment (90 MWt ± 2 MWt) with feeding pumps, bag filters and ash removal systems, counter-pressure steam turbine with generator, district heating exchangers (DH1, DH2), condensation and circulation pumps, new 110 kV connection, reconstruction of existing machine hall, piping systems, cooling system with river water intake, regenerative heater, exhaust systems, biomass reception and storage building with automatic sampling system, fuel transport system integration, regulatory and control system implementation, material supply, construction coordination, commissioning, hot/cold start-ups, functional and warranty testing, handover to trial operation, staff training, technical inspection documentation, and compliance support for grid connection and operational permits. Project duration covers complete design through operational handover. EU co-financing of up to EUR 30,000,000 from ERDF and Cohesion Fund under 2021-2027 European Cohesion Policy Program.

Bidder eligibility

Not explicitly stated in the provided tender notice content. General requirements for EPC contractors in major renewable energy infrastructure projects typically include: demonstrated experience in biomass power plant construction, engineering competence in thermal and electrical systems, financial capacity commensurate with project scale, relevant certifications and registrations in Slovenia or EU.

How bids are scored

Not disclosed in the provided tender notice excerpt. FIDIC Silver Book (EPC Turnkey Projects) conditions apply.

Key requirements

  • Full EPC (Engineering, Procurement, Construction) responsibility for biomass CHP plant with 90 MWt thermal capacity
  • Design, permitting, and technical documentation (PZI, PID, DZO) for entire project lifecycle
  • Demontage of existing boiler, turbine, electrical and auxiliary equipment from two blocks
  • Supply and installation of new biomass boiler system with fuel handling, bag filter, ash removal, steam turbine with generator, district heating exchangers, and 110 kV grid connection
  • Reconstruction of main engine room (GPO) and integration with existing 110 kV GIS substation

CPV codes

Relevant sectors

How this compares

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published3 Jun 2026
Buyer typeUtility
TypeWorks
MethodOpen
DeliveryOn-site
CountrySlovenia
RegionEurope
Budget range€30M
SubmissionNot specified in provided excerpt. Procurement conducted via TED (Tenders Electr
Last verified18 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)