Skip to content
Raise Lens
TENDER · TED (EU)utilityworks

Works for construction and civil engineering – Solid fuel boilers 2 x 4.5 MW, Borgholm Tender

Original: Works for complete or part construction and civil engineering work – Anbudsansökningsinbjudan Fastbränslepannor 2 x 4,5 MW, Borgholm - Steg 1

Borgholm Energi AB

In context

This is a contract notice published by a utility covering construction and works. Bids are invited through a restricted procedure. Delivery covers Sweden and the European Union (Europe). It is classified under Heating and Cooling, Renewable Energy and Energy Efficiency against the sustainability taxonomy rather than matched on keywords.

Summary

Borgholm Energi AB seeks to procure complete construction and electromechanical equipment supply for a new district heating plant with two 4.5 MW biomass boilers, one 5 MW oil boiler, and heat storage in Borgholm, Sweden. Bidders must be experienced in heat plant construction, biomass/oil combustion systems, and functional procurement under ABA 99 standards.

Summary by Raise Lens from the official notice · 31 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Borgholm Energi AB intends to construct a completely new heat plant for district heating production in Borgholm. The facility will be equipped with two (2) solid fuel boilers, one (1) oil boiler, and a smaller accumulator. The solid fuel boilers shall be 2 x 4.5 MW and the oil boiler 5 MW. The procurement and final contract is based on functional procurement in accordance with ABA 99 and LUF, which covers all electromechanical equipment from respective fuel storage to chimney outlet. The procurement is initiated with pre-qualification through this call for expressions of interest.

Key requirements

  • ✓Design and construct new district heating plant (värmeverk) for Borgholm municipality
  • ✓Supply and install two 4.5 MW solid fuel boilers, one 5 MW oil boiler, and heat accumulator tank
  • ✓Deliver all electromechanical equipment from fuel storage to chimney outlet
  • ✓Comply with ABA 99 and LUF functional procurement standards
  • ✓Prequalification step required before final tender submission

About this sector

Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.