Skip to content
Raise Lens

In context

This call is open to non-profits, consortia and engineering and construction contractors and 1 other. Funding is a grant. Coverage is read from the notice itself: Ireland. The funder accepts early-stage applicants.

Summary

The Apartment Charger Grant, delivered by SEAI on behalf of ZEVI, funds cabling, infrastructure, labour and construction costs for bulk EV charger installation in apartment and multi-unit developments. It is aimed at residents, owners and management companies in developments not already covered by other grants, working with an SEAI-registered Charge Point Operator.

Summary by Raise Lens from the official notice · 28 Oct 2026Accurate?

About this grant

The Apartment Charger Grant assists residents and owners of apartments and other multi-unit developments who want to install a home charger for their electric vehicle where the development is not covered by pre-existing grants. It is designed for bulk installation of chargers at a single location and supports cabling, infrastructure, labour and construction costs. Funding is provided by Zero Emission Vehicles Ireland (ZEVI) in the Department of Transport, and SEAI operates the scheme on its behalf. There are two routes. Under Route 1, where no EV charging system exists in a car park, the company managing the complex applies to SEAI for support covering up to 80% of infrastructure costs plus a fixed amount per charge point installed; residents can make separate arrangements with the management company to pay for dedicated chargers. Under Route 2, where an EV charging network already exists, residents seek permission from their management company to join the network and then apply individually through the Home Charger grant system. Applicants must partner with an SEAI-registered Charge Point Operator, who provides quotations and technical guidance, and management companies are encouraged to obtain three quotes. Grant levels vary by applicant type, and awards are subject to caps per dwelling and per development, with per-charge-point limits and benchmark-based assessment of eligible costs.

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

Eligibility

Eligible applicants are Owners' Management Companies, management companies of Build-to-Rent developments, local authorities, and approved housing bodies, as well as private and commercial landlords who own one or more units, though landlords are eligible only for a bulk installation. The development must have two or more units that share facilities, amenities and services and have shared or private parking, but no dedicated private off-street parking. Applicants outside these categories should contact SEAI to discuss eligibility. Applications must be made through a registered Charge Point Operator.

Key requirements

  • ✓Applicants must partner with an SEAI-registered Charge Point Operator for quotations and technical guidance
  • ✓Route 1 requires the management company to apply for up to 80% of infrastructure costs plus a fixed per-charge-point amount where no charging system exists
  • ✓Route 2 requires resident permission from the management company to join an existing network before individual application through the Home Charger grant system

Frequently asked questions

How much funding does Sustainable Energy Authority of Ireland (SEAI) offer?
Apartment charging grant offers $110K.
Who can apply for Apartment charging grant?
Eligibility covers organisations in IE; nonprofit, consortium, engineering-contractor, local-authority. See the eligibility criteria above for the full conditions.

Relevant sectors

E-Mobility grantsInfrastructure

How this compares

  • Compared with 6 similar grants (e-mobility in Ireland) listed in the last 12 months.
  • The same organisation listed 4 other similar grants here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.

Funding route · no open call
Deadline not stated · check listing
Get the official link (free account)

Free accounts: 1 official link a month · Pro: every link

Quick facts

Sourceseai
Budget$110K
Match funding20%
EligibilityIE
Org typesnonprofit, consortium, engineering-contractor, local-authority
Last verified28 Oct 2026

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.

Get alerts, free →