Skip to content
Raise Lens
GOV.UK

Changes to electric vehicle chargepoint grant schemes from 1 April 2026

Amount
Not stated · check listing
Deadline
31 Mar 2027, 00:00 UTC
 
Who can apply
Individuals, SMEs, large companies and 2 more · United Kingdom

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 338 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 27 Apr 2026338 days to prepare
Found today · 24 Nov 2026127 days to prepare

In context

This call is open to individuals, small and medium-sized businesses and large companies and 2 others, at scale-up and mature. Funding is a grant. Coverage is read from the notice itself: United Kingdom.

Summary

This grant provides funding for electric vehicle chargepoint installation at homes and workplaces, with scheme changes effective from 1 April 2026. It is open to property owners and businesses seeking to deploy EV charging infrastructure.

Summary by Raise Lens from the official notice · 6 Aug 2026Accurate?

About this grant

From that date the maximum grant for most home and workplace schemes rose from £350 to £500 per socket, while state-funded education institutions can claim up to £2,000 per socket under a dedicated workplace charging stream. Eligibility depends on which scheme applies. Individuals, small and large companies, nonprofits and local authorities are all among the eligible organisation types. Installations must take place at residential or workplace locations, and applicants need property ownership or authorisation to install the equipment. Applications are checked administratively for eligibility and compliance rather than scored competitively. The call opens on 6 July 2026 and closes on 31 March 2027.

Full description from the source

This page provides guidance on changes to the Office for Zero Emission Vehicles (OZEV) electric vehicle chargepoint grant schemes effective from 1 April 2026. Five grant schemes have been extended for a final year until 31 March 2027, with updated grant rates, while three schemes closed to new applications on 31 March 2026. The extended schemes include the flats and renters grant, residential landlord chargepoint grant, households with on-street parking grant, the Workplace Charging Scheme (WCS), and the WCS for state-funded education institutions. From 1 April 2026, the maximum grant rate for most home and workplace schemes increased from £350 to £500 per socket. State-funded education institutions can apply for up to £2,000 per socket under the updated WCS. The grants support the installation of electric vehicle chargepoints at homes, workplaces, and educational institutions across the UK to accelerate the transition to zero emission vehicles. The page also details a new application platform for the flats and renters and residential landlord chargepoint grants, photo evidence requirements for installer claims, and closure timelines for the three schemes that ended on 31 March 2026, specifically the staff and fleets grant, commercial landlord chargepoint grant, and residential landlord infrastructure grant.

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

Eligibility

Eligibility varies by scheme. For the flats and renters grant and residential landlord chargepoint grant, residents can apply for one socket and landlords for up to 200 sockets across their sites. For the Workplace Charging Scheme, businesses and other workplaces are eligible for up to 40 sockets across their sites. State-funded education institutions are eligible under a dedicated WCS stream for up to 40 sockets. For the closed staff and fleets grant, the installing business must have had fewer than 250 staff, with chargepoints restricted to staff and fleet vehicles only, requiring at least one socket and work on at least five off-street, private parking spaces. For the closed commercial landlord chargepoint grant, the landlord must let or lease property to a business paying business rates, with chargepoints for staff and fleet use only, for up to 100 sockets per year. For the closed residential landlord infrastructure grant, landlords must own or manage a property with multiple homes, must install at least one socket and work on at least five off-street parking spaces, and the grant is not available for holiday rentals. Geographic eligibility is limited to the United Kingdom.

How it's scored

The page does not describe a competitive evaluation or scoring process. Applications are assessed administratively for eligibility and compliance with grant criteria. OZEV estimates it will take up to 10 working days to assess applications and claims submitted on the new platform. Customers must not have their chargepoint installed prior to receiving notification of eligibility from OZEV. Installers must provide specified photographic evidence with their claims, and insufficient evidence may result in rejection with an opportunity to resubmit.

Key requirements

  • Eligible chargepoint installation at residential or workplace locations
  • Compliance with updated OZEV scheme rules effective 1 April 2026
  • Property ownership or authorization to install charging infrastructure

Frequently asked questions

When is the Changes to electric vehicle chargepoint grant schemes from 1 April 2026 deadline?
Applications close 31 Mar 2027, 00:00 UTC.
Who can apply for Changes to electric vehicle chargepoint grant schemes from 1 April 2026?
Eligibility covers individuals, SMEs, large companies, non-profits and local authorities in the United Kingdom. See the eligibility criteria above for the full conditions.

Relevant sectors

How this compares

How this compares

  • Compared with 34 similar grants (e-mobility in United Kingdom) listed in the last 12 months.
  • Similar grants that state a value range from $2k to $188m, with a median of $25m (5 grants).
  • The same organisation listed 17 other similar grants here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceGOV.UK
Opens6 Jul 2026
EligibilityUnited Kingdom
Org typesIndividuals, SMEs, large companies, non-profits, local authorities
Last verified6 Aug 2026

Documents to prepare

We found no document list in this listing. Usually asked for in capital grants; typical only, not this funder’s list. Check the official listing.

  • Project plan with timeline and milestones
  • Quotes or cost estimates for the works or equipment
  • Proof of ownership, lease or permission for the site
  • Planning permission or permits, where needed
  • Evidence of match funding
  • Latest annual accounts