This grant closed on 26 May 2026. The deadline passed 181 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Electric vehicle chargepoint and infrastructure specifications
- Amount
- Not stated · check listing
- Deadline
- 26 May 2026, 22:59 UTCDeadline passed
- Who can apply
- Large companies, SMEs, non-profits and 2 more · United Kingdom
In context
This call is open to large companies, small and medium-sized businesses and non-profits and 2 others, at scale-up and mature. Funding is a grant. Coverage is read from the notice itself: United Kingdom.
Summary
This grant provides specifications and claim guidance for electric vehicle chargepoint and infrastructure projects funded by the UK government's Office for Zero Emission Vehicles. It is designed for organizations deploying EV charging infrastructure and related systems.
About this grant
This call funds electric vehicle chargepoint deployment and related infrastructure in the United Kingdom, with installers and eligible organisations invited to claim against the published specifications. Eligible organisation types include large companies, SMEs, nonprofits, local authorities and engineering contractors, and the scope covers Great Britain only. The work is aimed at scaled, mature projects rather than early-stage ventures, and the instrument is a grant. Chargepoints must appear on the funder's list of eligible models and supply at least 3.5kW per socket. They need a three-year on-site warranty covering parts and installation, and must meet accessibility requirements for drivers with disabilities. Projects must follow the funder's claim guidance and meet its eligibility criteria. The call opens on 6 July 2026.
Full description from the source
This guidance from the Office for Zero Emission Vehicles (OZEV) sets out the chargepoint and infrastructure specifications and claim procedures for installers participating in the UK's electric vehicle (EV) chargepoint grant schemes. It covers what chargepoints and infrastructure are eligible, technical installation standards, and how installers should submit claims and invoices for the grants. The grants support the installation of EV chargepoints across several categories: renters and flat owners, households with on-street parking (including cross-pavement solutions), residential and commercial landlords (including car parks), and business staff and fleet car parks. Eligible chargepoints must supply a minimum of 3.5kW per socket, carry a 3-year on-site warranty on parts and installation, meet accessibility needs for EV owners with disabilities, and appear on OZEV's list of eligible chargepoint models. Installations must comply with BS EN 61851, the current IET wiring regulations (BS 7671), the IET Code of Practice for Electric Vehicle Charging Equipment Installations, the Electricity Safety, Quality and Continuity Regulations, and relevant building regulations. For landlord and business/fleet schemes, charging infrastructure must include a new electrical connection at a metered supply point, dedicated cabling routes via containment systems (ducting, trunking, conduits, trays/ladders), provision for future chargepoint connection locations, and appropriate power capacity including possible upgrades or load balancing. Eligible claim costs include chargepoint hardware and software, communications media, grid connections (excluding reinforcement), concrete plinths for future chargepoints, signage, reinstatement, vehicle barriers, civil engineering, labour, project management, VAT, smart meters/current clamps installed alongside chargepoints, and site survey works leading to completed installations. Ineligible items include interest charges, administration costs, contingency inflation, new land, ongoing operating/maintenance/communication costs, warranty extensions beyond 3 years, transport, and marketing. Claims are submitted through the OZEV claims management portal with an invoice clearly relating to the claim. The commercial landlord grant, residential car parks (landlord infrastructure) grant, and the business staff and fleet car parks grant closed to customer applications on 31 March 2026, with claim submissions accepted until 26 May 2026. Specific p…
This grant has closed
Similar grants are open now. Pro keeps the official link on every listing, closed ones included.
Eligibility
This page is installer-facing guidance rather than a customer eligibility document. Chargepoints must be on the OZEV list of eligible models and meet minimum technical, warranty and accessibility standards. For renter/flat owner and on-street parking grants, chargepoints must be installed at a residential property. The commercial landlord, residential car parks (landlord infrastructure), and business staff and fleet car parks grants closed to new customer applications on 31 March 2026, with claims accepted until 26 May 2026. Customer eligibility is covered in separate OZEV guidance. Geographic scope is the United Kingdom.
Key requirements
- Compliance with published chargepoint and infrastructure specifications
- Adherence to claim guidance and eligibility criteria set by OZEV
- Projects must involve electric vehicle chargepoint deployment or related infrastructure
Relevant sectors
How this compares
About this sector
About this sector
Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this listing. Usually asked for in capital grants; typical only, not this funder’s list. Check the official listing.
- Project plan with timeline and milestones
- Quotes or cost estimates for the works or equipment
- Proof of ownership, lease or permission for the site
- Planning permission or permits, where needed
- Evidence of match funding
- Latest annual accounts