Subsidies for Companies with Large Housing Stocks? Charging Stations in Multi-Unit Residential Buildings
Bundesregierung / Förderdatenbank
Funding route · no open call
- Amount
- €30M
- Deadline
- Not stated · check listing
- Who can apply
- SMEs, large companies, non-profits and 3 more · Germany
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 1 Dec. This page is open to everyone now.
In context
This call is open to small and medium-sized businesses, large companies and non-profits and 3 others. Funding is a grant. Coverage is read from the notice itself: Germany.
Summary
This German federal programme provides a competitive grant of up to 70% of eligible costs for private, non-public EV charging infrastructure (Type 2 or CCS, max 22 kW) and related grid connections and electrical works in existing multi-family buildings. It targets housing companies, cooperatives and other owners of large residential portfolios.
About this grant
This German federal programme offers competitive grants covering up to 70% of eligible costs for private, non-public EV charging points in existing multi-family buildings. Eligible points must use Type 2 or CCS connectors rated up to 22 kW, and the funding also extends to related grid connections and electrical works. The aim is to expand charging capacity at residential properties, targeting housing companies, cooperatives and other owners of large residential portfolios. Commercially used spaces are excluded, as are buildings whose building permit application is dated after 24 March 2021. Planning, permitting and operating costs are not eligible. Grants are capped at 1,300 EUR per space without a charge point, 1,500 EUR with one, and 2,000 EUR where bidirectional charging is supported, with a ceiling of 30 million EUR per company. Companies in financial difficulty or with outstanding recovery orders are excluded, and double funding with other public money is not permitted. The call opens on 26 August 2026.
Full description from the source
The programme provides a non-repayable grant for building private charging infrastructure for electric vehicles at existing multi-unit residential buildings (Mehrparteienhäuser) in Germany. It is aimed at housing companies, cooperatives and other owners of large housing stocks. Eligible costs include the purchase and installation of non-publicly accessible charging equipment (Type 2 or CCS connection, maximum 22 kW), grid connection, necessary electrical installation and building works. Planning, approval and operating costs are not eligible. The grant covers up to 70% of eligible total costs, capped per parking space: a flat 1,300 EUR without an installed charge point, 1,500 EUR with an installed charge point, and 2,000 EUR where the charge point supports bidirectional charging. A company may receive at most 30 million EUR in total under the programme. Large projects may draw up to 90% in advance under certain conditions; otherwise payment follows successful completion. Awards are made through a competitive selection process within available budget funds. Applicants must first obtain a cost estimate from a qualified electrician, then submit an online application with PDF documents. Work and orders may not begin before the grant decision notice. Projects must be contracted within 9 months of the notice and completed within 24 months, with proof of use submitted within 3 months after the implementation period. A 3-year commitment period applies.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
Eligibility
Applicants must own or manage large housing stocks, such as housing companies, cooperatives or other owners of large residential portfolios, including companies, private persons and associations as listed by the funder. The parking space must belong to an existing multi-unit residential building in Germany with at least 3 residential units, and must be used in connection with residential use by residents. At least 6 parking spaces or at least 20% of all parking spaces at the building must be pre-wired. Charging must use renewable electricity. Commercially used parking spaces are excluded, as are buildings with a building permit application dated after 24 March 2021. Companies in financial difficulty or that have not complied with recovery orders are excluded, as are private or public legal entities wholly or indirectly funded by the federal government. Double funding with other public money for the same expenditure is not permitted. Homeowners' associations (WEG) may apply without a resolution but must submit the owners' resolution within 6 months of the first decision. No contracts for deliveries or services may be concluded before the grant decision.
How it's scored
Applications are assessed in a competitive selection procedure according to fixed criteria by the project executing agency, PricewaterhouseCoopers GmbH Wirtschaftsprüfungsgesellschaft (PwC). Specific scoring weights and panel composition are not stated on the page.
Key requirements
- Applicants must own or manage large residential portfolios in existing multi-family buildings in Germany
- Only non-public charging points with Type 2 or CCS connectors up to 22 kW are eligible; planning, permitting and operation costs are excluded
- Grant covers up to 70% of eligible costs with per-space caps (1,300 EUR without charge point, 1,500 EUR with one, 2,000 EUR if bidirectional) and a 30 million EUR cap per company, awarded competitively subject to available budget
Funder contact
The notice names a programme contact you can speak to before applying.
Frequently asked questions
Frequently asked questions
- How much funding does Bundesregierung / Förderdatenbank offer?
- Subsidies for Companies with Large Housing Stocks? Charging Stations in Multi-Unit Residential Buildings offers €30M.
- Who can apply for Subsidies for Companies with Large Housing Stocks? Charging Stations in Multi-Unit Residential Buildings?
- Eligibility covers SMEs, large companies, non-profits, co-operatives, local authorities and consortia in Germany. See the eligibility criteria above for the full conditions.
Relevant sectors
How this compares
How this compares
- Compared with 34 similar grants (e-mobility in Germany) listed in the last 12 months.
- Its value of $33m is above 93% of the 15 similar grants that state a value; their median is $500k.
- The same organisation listed 32 other similar grants here in the last 12 months.
Closest open grants
- Sustainable Mobility Funding (ERDF/JTF Mobility Guideline 2021–2027)
- Funding for qualified technical concepts in the context of sustainable mobility
- Sustainable Mobility Investment Loan – Individual Variant
- Sustainable Mobility Investment Loan – Standard Variant
- Grants for Sustainable Connected Mobility in Urban Regions (Sustainable Urban Mobility Funding Guidelines)
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
Named in this listing. Check the official listing for the full list.
- Cost estimate from a qualified electrician
- Online application with PDF documents
- Owners' resolution (for homeowners' associations, within 6 months of the first decision)
- Proof of use (submitted within 3 months after the implementation period)