Funding for Homeowners' Associations (WEG) and Their Members – Charging Stations in Multi-Unit Buildings
Bundesregierung / Förderdatenbank
Funding route · no open call
- Amount
- €1,818
- Deadline
- Not stated · check listing
- Who can apply
- Non-profits, individuals, community groups · Germany
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 1 Dec. This page is open to everyone now.
In context
This call is open to non-profits, individuals and community groups. Funding is a grant. Coverage is read from the notice itself: Germany.
Summary
This German federal programme provides a lump-sum grant per parking space for pre-wiring, grid connection and installation of charging points, including bidirectional chargers, in existing multi-unit residential buildings. It is aimed at homeowners' associations (WEG) and individual condominium owners.
About this grant
Homeowners' associations (WEG) and individual condominium owners are the intended applicants. The amount is €1,300 for a space without a charging point, €1,500 with one, and €2,000 for a bidirectional point. Planning and operating costs are not covered, and payment is made only after the project is completed. To qualify, the building needs at least three residential units and must have at least six parking spaces, or at least 20% of its spaces, pre-cabled. The call opens on 21 August 2026.
Full description from the source
This German federal programme provides a flat-rate grant for installing private electric vehicle charging infrastructure in existing multi-unit residential buildings (Mehrparteienhäuser). It targets homeowners' associations (Wohnungseigentümergemeinschaften, WEG) and individual condominium owners. Eligible costs include pre-cabling of parking spaces, grid connection, installation of charging points, necessary electrical installation work, and structural measures on the building. Planning and operating costs are excluded. The grant is paid per parking space: 1,300 EUR without an installed charging point, 1,500 EUR with a charging point, and 2,000 EUR for a bidirectional charging point. Payment is a one-off disbursement after the completed project and audited proof of use (Verwendungsnachweis) is verified by the project executing agency. The procedure requires obtaining a cost estimate from a qualified electrician, submitting the application online via the project agency portal, receiving a written approval notice, then commissioning works within 9 months and completing the whole project within 24 months. Applications are processed in order of receipt. The call for applications runs from 15 April 2026 to 10 November 2026. Key conditions include at least 3 residential units in the building, pre-cabling of at least 6 spaces or at least 20% of spaces, charging exclusively with renewable electricity, a 3-year retention period, and a building permit filed on or before 24 March 2021. Commercial parking spaces are excluded, as is combining with other public funds for the same costs.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
Eligibility
Eligible applicants are homeowners' associations (WEG) and individual owners in existing multi-unit residential buildings in Germany with at least 3 residential units. Private persons, companies and associations are listed as eligible applicant types. The parking space must be used in connection with residential use; commercial parking spaces are excluded. At least 6 parking spaces or at least 20% of all parking spaces at the building must be pre-cabled. The charging point must run exclusively on renewable electricity. Buildings with a building permit application dated after 24 March 2021 are excluded. Grants cannot be combined with other public funding for the same costs or with parallel applications for the same property under this guideline, and de minimis aid above 300,000 EUR over three years is excluded. Contract commitments before approval are not permitted. WEG applicants must provide the owners' resolution within 6 months of the initial decision.
How it's scored
Applications are approved in the order in which they are received (first come, first served), provided they meet the eligibility and technical requirements. No weighted scoring criteria or panel assessment are described.
Key requirements
- Applicant must be a homeowners' association (WEG) or an individual owner in an existing multi-unit residential building in Germany
- Lump-sum grant per parking space: €1,300 without charging point, €1,500 with charging point, €2,000 for bidirectional charging point
- Planning and operating costs are excluded; payment is made after successful completion of the project
Funder contact
The notice names a programme contact you can speak to before applying.
Frequently asked questions
Frequently asked questions
- How much funding does Bundesregierung / Förderdatenbank offer?
- Funding for Homeowners' Associations (WEG) and Their Members – Charging Stations in Multi-Unit Buildings offers €1,818.
- Who can apply for Funding for Homeowners' Associations (WEG) and Their Members – Charging Stations in Multi-Unit Buildings?
- Eligibility covers non-profits, individuals and community groups in Germany. See the eligibility criteria above for the full conditions.
Relevant sectors
How this compares
How this compares
- Compared with 34 similar grants (e-mobility in Germany) listed in the last 12 months.
- Its value of $2k is above 7% of the 15 similar grants that state a value; their median is $550k.
- The same organisation listed 32 other similar grants here in the last 12 months.
Closest open grants
- Sustainable Mobility Funding (ERDF/JTF Mobility Guideline 2021–2027)
- Funding for qualified technical concepts in the context of sustainable mobility
- Subsidies for Cargo Bikes and Cargo Pedelecs (Cargo Bike Guideline)
- State Initiative III Market Growth for Electromobility Baden-Württemberg – Electric Cargo Bikes
- Economy-related electromobility
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
Named in this listing. Check the official listing for the full list.
- Cost estimate from a qualified electrician
- Owners' resolution (WEG applicants, within 6 months of the initial decision)
- Building permit application dated on or before 24 March 2021
- Audited proof of use (Verwendungsnachweis)