For electricity generation facilities using wind and photovoltaic power in non-peninsular territories Grant
In context
This call is open to startups, small and medium-sized businesses and large companies and 5 others, at prototype and pilot stage and scale-up and mature. Funding is a grant. Coverage is read from the notice itself: Spain.
This grant funds the construction and deployment of wind and photovoltaic electricity generation facilities in non-peninsular Spanish territories (primarily island regions). It is open to organizations seeking capital support for renewable energy infrastructure projects in these geographic areas.
About this grant
This IDAE programme funds the construction of wind and solar photovoltaic electricity generation installations in Spain's non-peninsular territories, which are the Canary Islands and the Balearic Islands. Under Law 24/2013 on the Electricity Sector (Article 10), these isolated systems follow a special regulatory framework. Their small, isolated grids make it harder to integrate renewable generation, and fossil-fuel thermal technologies still cover most demand. In 2016 renewables supplied about 6% of electricity in these territories, compared with 40.2% on the peninsula. The programme aims to advance Spain's binding renewable targets under Directive 2009/28/EC by building wind and PV plants that diversify primary energy sources, reduce energy dependence and cut CO2 emissions. The page notes that electricity sales alone do not recover investment costs and leave a financing gap, so public aid is needed to ensure these installations are built. The page lists the calls under this programme, including EOLCAN 2 (wind in the Canary Islands), SOLCAN (PV in the Canary Islands), SOLBAL (PV in the Balearic Islands) and SOLBAL 2. Several of these are shown as closed. The aid is co-financed by the European Regional Development Fund (FEDER) and is part of IDAE's renewables investment lines.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
Eligibility
The page indicates that aid is directed at investment in electricity generation installations using wind or solar photovoltaic technology located in the Canary Islands or the Balearic Islands. Specific applicant types, minimum project size, stage requirements and prior-recipient rules are not stated on this page and would need to be checked in the individual call documents.
Key requirements
- ✓Project must involve production facilities for wind or photovoltaic electricity generation
- ✓Project must be located in non-peninsular Spanish territories (island regions)
- ✓Applicant must be eligible organization type under IDAE criteria
Funder contact
The notice names a programme contact you can speak to before applying.
Frequently asked questions
- Who can apply for For electricity generation facilities using wind and photovoltaic power in non-peninsular territories?
- Eligibility covers organisations in ES; startup, sme, large-company, nonprofit, social-enterprise, cooperative, local-authority, consortium. See the eligibility criteria above for the full conditions.
Relevant sectors
How this compares
- Compared with 44 similar grants (renewables in Spain) listed in the last 12 months.
- Similar grants that state a value range from $4.5m to $673m, with a median of $165m (9 grants).
- The same organisation listed 23 other similar grants here in the last 12 months.
Closest open grants
- Programa INNOVAE
- Pre-feasibility Study Program for Biogas Projects for Thermal and/or Electrical Uses, and Biomethane for Transport Use
- Renewable Energy for Self-Consumption, Storage, and Thermal Systems in the Residential Sector (RD 477/2021, PRTR)
- Energy transition in the islands under the PRTR
- BStartup Green: Dedicated investment and banking programme targeting green/sustainability-focused startups
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.
Get alerts, free →