Pre-Feasibility Study Program for Biomethane Projects for Transport Use Grant
In context
This call is open to startups, small and medium-sized businesses and large companies and 5 others, at idea and R&D stage and prototype and pilot stage. Coverage is read from the notice itself: Spain.
IDAE's programme funds free technical and economic pre-feasibility studies for projects producing biomethane from biogas for use as fuel in heavy-duty transport fleets. It is aimed at project promoters who want to test technical and economic viability before committing to investment in a biomethane plant.
About this grant
This IDAE programme funds free technical and economic pre-feasibility studies for projects that would produce biomethane from biogas and use it as fuel for heavy-duty transport. It is part of the Spanish Biogas Roadmap, implementing lines of action 41 and 43 under milestone 114 of Spain's Recovery, Transformation and Resilience Plan (PRTR), funded by NextGenerationEU. The page describes the programme as a promotion mechanism that lets project promoters test whether a biomethane plant is technically and economically viable before committing to investment. Eligible projects may use existing biogas from wastewater treatment plants, landfills, or other sources (excluding landfill degassing), new biogas from anaerobic digestion of agricultural, industrial or other substrates, or a combination of both. The biomethane is intended for heavy transport fleets, with possible use of surplus for thermal and/or electrical applications. Studies are carried out in sequential phases. Each phase proceeds only once evaluation criteria defined by IDAE are met. The final scope varies with the project's characteristics. Applicants may be asked to supply samples for laboratory testing. The programme has a maximum execution period of 30 months, and the technical assistance contracted by IDAE analyses the information supplied on the fleet, biogas and substrates. Applications are submitted as signed PDF forms with an Excel copy, sent to the programme mailbox. Requests are handled in order of receipt of correctly completed applications.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
Eligibility
Applicants must hold substrates or produce biogas that can be upgraded to biomethane for use in heavy-vehicle fleets, either their own or linked to them. The biogas may be existing or derived from biodegradable residues that can serve as substrates. The application must be made by the holder or concessionaire of the project, who must demonstrate a concession or equivalent right to invest in and operate the future project for more than ten years. Links to a substrate supplier or a vehicle fleet are accepted where a letter of intent has been signed with the applicant expressing interest in the study and willingness to implement the project if viable. The page refers to Spanish administrations and provinces, indicating the programme is aimed at projects in Spain. No minimum company size, sector-specific exclusion, or prior-recipient rule is stated.
How it's scored
Applications are handled in order of submission, provided they are correctly completed. Studies proceed in phases, and progression to each subsequent phase depends on IDAE-defined evaluation criteria being met. The page does not publish scoring weights or panel composition.
Key requirements
- ✓Projects must produce biomethane from existing or new biogas (wastewater, agricultural, industrial or other substrates; landfill degassing excluded) for heavy transport fleets
- ✓Studies proceed in sequential phases, each released only when IDAE evaluation criteria are met; maximum execution period 30 months
- ✓Applications submitted as signed PDF form plus Excel copy to the programme mailbox, handled in order of receipt of complete applications
Funder contact
The notice names a programme contact you can speak to before applying.
Frequently asked questions
- Who can apply for Pre-Feasibility Study Program for Biomethane Projects for Transport Use?
- Eligibility covers organisations in ES; startup, sme, large-company, nonprofit, social-enterprise, cooperative, local-authority, consortium. See the eligibility criteria above for the full conditions.
Relevant sectors
How this compares
- Compared with 44 similar grants (renewables in Spain) listed in the last 12 months.
- Similar grants that state a value range from $4.5m to $673m, with a median of $165m (9 grants).
- The same organisation listed 23 other similar grants here in the last 12 months.
Closest open grants
- Programa INNOVAE
- Pre-feasibility Study Program for Biogas Projects for Thermal and/or Electrical Uses, and Biomethane for Transport Use
- Renewable Energy for Self-Consumption, Storage, and Thermal Systems in the Residential Sector (RD 477/2021, PRTR)
- Energy transition in the islands under the PRTR
- BStartup Green: Dedicated investment and banking programme targeting green/sustainability-focused startups
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.
Get alerts, free →