Supply and installation of electricity storage for Mińsk Mazowiecki municipal facilities 2026 Tender
Original: Accumulators, primary cells and primary batteries – Dostawa i montaż magazynów energii elektrycznej dla obiektów infrastruktury komunalnej Gminy Mińsk Mazowiecki
Gmina Mińsk Mazowiecki
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Poland (Europe). It is classified under Energy Storage against the sustainability taxonomy rather than matched on keywords.
A Polish municipality is procuring design, supply, installation, commissioning and integration of nine electricity storage (battery) systems at three primary schools, three water treatment stations and three pumping stations, linked to existing or planned PV installations, with 10-year system and 5-year component warranties. Local electrical installers, energy-storage integrators and SMEs able to deliver turnkey BESS projects with PV integration fit this tender.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Gmina Mińsk Mazowiecki is procuring the design, supply, installation, commissioning and integration of nine electrical energy storage systems (batteries) for municipal infrastructure. The sites are three primary schools (Janów, Brzózie, and Huta Mińska with its seat in Cielechowizna), three water treatment stations (Królewiec, Janów, Zamienie) and three pumping stations (Brzózie, Cielechowizna, Janów). The storage systems must be integrated with the site electrical installations and with existing or planned photovoltaic installations. Two pumping stations (Brzózie and Cielechowizna) are not linked to existing PV, but the buyer holds design documentation for their execution. The scope also includes preparing Polish-language operating instructions, warranty service, and training for persons designated by the buyer on operation, use, maintenance and safety. The contractor must provide servicing throughout the warranty and rękojmia (statutory defect liability) periods. The buyer requires a 10-year manufacturer warranty for the battery system (AC charger and control unit) and 5-year manufacturer warranties for other installed components and materials. Detailed design and installation requirements are set out in the PFU (Program Functionalno-Użytkowy, functional-utility programme), Annex 1 to the SWZ. Contract duration is not stated on the page.
Key requirements
- ✓Design, supply, installation, commissioning and integration of nine electricity storage systems with PV
- ✓Serve 3 primary schools, 3 water treatment stations and 3 pumping stations in Gmina Mińsk Mazowiecki
- ✓10-year manufacturer warranty on battery system (AC charger and control unit), 5 years on other components, plus Polish operating manuals and training
CPV codes
Relevant sectors
How this compares
- Compared with 88 similar tenders (energy storage in Poland) listed in the last 12 months.
- It allows 34 days to respond, longer than the typical 15 days across 62 similar tenders.
- This is the only similar tender from this organisation listed here in the last 12 months.
Closest open tenders
- EPC contractor for MEE ELKO I electricity storage project at Świerże Górne
- Electric accumulators – energy efficiency improvement of public facilities in Wilamowice Commune
- Design, supply, installation and commissioning of demonstration hydrogen energy storage installation
- EPC Contractor for Electrical Energy Storage (MEE ELKO I) Project
- Computer equipment and supplies – Purchase of computer equipment for Opole garrison units
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Energy storage funding spans batteries, long-duration storage, thermal storage and the controls that dispatch them. Research calls focus on chemistry and system cost. Demonstration programmes test grid services, while tenders buy capacity, flexibility and installation contracts. Buyers usually want evidence of safety certification, round-trip efficiency and a credible route to grid connection.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →