This tender closed on 19 August 2026. The deadline passed 99 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Acquisition of 15 kW hybrid photovoltaic system with 16 kWh battery storage
Original: Achiziționarea unui sistem fotovoltaic cu invertor hibrid de minimum 15 kW AC și acumulator pentru stocarea energiei de minimum 16 kWh, inclusiv proiectare, livrare, montare, conectare și punere în funcțiune, destinat producerii energiei electrice pentru autoconsum și livrării surplusului în rețeaua operatorului de distribuție.
Uniunea pentru Echitate și Sănătate
- Value
- MDL 288K
- Closes
- 19 Aug 2026Closing date passed
- Where
- EU
- Contract
- Mixed · Government
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers the European Union. It is classified under Renewable Energy and Energy Storage against the sustainability taxonomy rather than matched on keywords.
Summary
Procurement of a hybrid solar photovoltaic system (minimum 15 kW AC) with energy storage (minimum 16 kWh) including design, installation, and commissioning for self-consumption and grid feed-in. Suitable for renewable energy installers, solar integrators, and energy storage system providers.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Procurement of a photovoltaic system with hybrid inverter of minimum 15 kW AC capacity and energy storage accumulator of minimum 16 kWh, including design, delivery, installation, connection and commissioning. The system is intended for electricity generation for self-consumption and delivery of surplus to the distribution network operator. Scope includes photovoltaic modules, three-phase hybrid inverter, energy storage accumulator, mounting and fixing system, electrical materials and accessories, electrical connection materials, and services.
Key requirements
- Hybrid inverter minimum 15 kW AC three-phase capacity
- Energy storage battery minimum 16 kWh capacity
- Complete design, delivery, installation, electrical connection and commissioning
- Grid interconnection capability for surplus energy feed-in
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)