TENDER · france-placegovernmentworks

Adaptation of CNG infrastructure to 2027-2030 bus fleet changes

Original: Adaptation des infrastructures GNV aux évolutions du parc Bus 2027-2030

Tisséo Voyageurs

In context

This is a contract notice published by a government body covering construction and works. Delivery covers France (Europe). It is classified under Heating and Cooling and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Tisséo Voyageurs is tendering works in four separate lots to adapt its natural gas vehicle (GNV) bus refuelling infrastructure to changes in its bus fleet between 2027 and 2030. Bidders suited to this are electrical, gas and civil works contractors able to deliver lot-sized public transport depot installations.

Summary by Raise Lens from the official notice · 1 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Marché scindé en 4 lots. Chaque lot fera l'objet d'une attribution séparée. Les lots 01 à 03 seront conclus sous la forme de marchés à prix forfaitaires et le lot 04 sous la forme d'un marché à prix mixtes: Une partie sera réglée au forfait et une partie sera réglée hors forfait sur bons de commande via des prix unitaires fixés au bordereau des prix unitaires. Ces commandes hors forfait ne pourront excéder le seuil suivant : seuil maximum de 100 000 euro(s) H.T. Le délai global prévu pour l'exécution de l'ensemble des prestations est de 30 mois à compter de la date de notification avec 2 mois de période de préparation et 12 mois d'essais de bon fonctionnement après réception . Ce délai s'entend hors garantie de parfait achèvement. Date prévisionnelle de notification: 01/04/2027 Descripteurs : Electricité (travaux), Prestations de services, Voirie et réseaux divers

Key requirements

  • ✓Four separate lots, each awarded individually, lots 01-03 at fixed lump-sum prices and lot 04 mixed lump-sum plus unit-price orders capped at €100,000 excl. VAT
  • ✓Overall execution period of 30 months from notification, including 2-month preparation and 12-month trial operation after reception, excluding defects-liability guarantee
  • ✓Forecast notification date 01/04/2027; electricity works and gas-related installation for public transport bus depots

Relevant sectors

About this sector

Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.