Air-conditioning installation work – Refrigeration systems - GS Buggingen 2026 Tender
Original: Air-conditioning installation work – Kältetechnische Anlagen - GS Buggingen
Gemeinde Buggingen
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Germany and the European Union (Europe). It is classified under Heating and Cooling and Methane and Super Pollutants against the sustainability taxonomy rather than matched on keywords.
The Gemeinde Buggingen is procuring supply, installation, commissioning and four-year maintenance of an air-cooled R290 chiller with heat exchanger, cold storage and piping, connected to ventilation cooling coils and underfloor cooling for a new school extension. It suits HVAC and refrigeration contractors with installation experience in German public buildings, working during live school operation.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Gemeinde Buggingen is extending and renovating the primary school at Wilhelm-Ritter-Straße 3, 79426 Buggingen. The project includes a two-storey, non-basement L-shaped annex (approx. 9,400 m³ gross volume) with childcare rooms, a canteen with kitchen, classrooms and a technical centre. This lot covers the subsequent installation of refrigeration generation for the new building, to be fitted during the construction phase. Scope of supply and installation: an air-cooled chilled water unit (refrigerant R 290, approx. 56 kW cooling capacity) with hydraulic module on the flat roof, including crane, heat exchanger (55 kW), cold storage tank (2,000 l), pumps, fittings and metering. Steel piping (DN 15-65) with cold insulation (Armaflex inside, sheet-metal cladding outside). Connection to the cooling coils of the ventilation units and to the underfloor heating system (surface cooling). Integration into the building management system via Modbus, and coordination with the BMS and heating trades. Commissioning, balancing, as-built documentation and registration with the grid operator. A four-year full maintenance service is required and is included in the evaluation. Works take place during ongoing school operation, so noisy work and deliveries must be coordinated with the school.
How bids are scored
The four-year full maintenance contract is explicitly included in the evaluation ("fließt in die Wertung ein"). No price/quality split or weightings are disclosed on the page.
Key requirements
- ✓Supply and install air-cooled chiller (R290, approx. 56 kW) with hydraulic module on flat roof
- ✓Connect to ventilation unit cooling coils and underfloor cooling, with Modbus integration into building management system
- ✓Commissioning, balancing, as-built documentation, grid operator registration and 4-year full maintenance (scored)
CPV codes
Relevant sectors
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →