This tender has closed. The deadline passed 115 days ago.
You can no longer apply, but the details below are kept for reference, and there are similar open opportunities in the sidebar.
Airport terminal capacity expansion – Design and construction services for a major European airport infrastructure project 2026 Tender
organisation
In context
This is a contract notice published by a state-owned enterprise covering a mix of works, supplies and services. Delivery covers Romania and the European Union (Europe). It is classified under Sustainable Buildings against the sustainability taxonomy rather than matched on keywords.
This tender procures design services, technical assistance, and construction works to modify terminal flows and increase operational capacity at a major airport in Central Europe. Bidders should be multidisciplinary engineering and construction firms with airport infrastructure expertise and capacity for large-scale terminal renovation projects.
Unlock the funder, link and full detail
Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.
About this tender
This tender covers design services (DTAC, DTOE, PTE) including technical assistance and execution works for the investment objective titled 'Modifications of terminal flows to increase operational capacity at AIHCB' (Henri Coandă International Airport Bucharest). The scope encompasses full design documentation (Technical Design Authorization Certificate – DTAC, Technical Design for Execution – DTOE, and Technical Project for Execution – PTE), technical assistance during construction, and the actual execution of works aimed at modifying passenger terminal flows to increase the airport's operati …
Relevant sectors
The direct link to bid is a Pro feature.