A Welsh charity is procuring a single contractor to design, supply, install and commission about 75 kWp of rooftop solar PV, 161 kWh of battery storage, heat pumps and an electric boiler at Amelia Trust Farm, in two stages with the install stage released by written notice. Suited to MCS-certified installers, alone or in joint bids or with specialist subcontractors, who can meet the fixed March 2027 grant deadline.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Ynni Teg Cyf is running this tender on behalf of Amelia Methodist Trust Company Limited (Amelia Trust Farm), a Welsh charity running a working farm and community site at Five Mile Lane, Walterston, Barry CF62 3AS. The Trust is looking for a single contractor to design, supply, install and commission rooftop solar PV of about 75 kWp across the Sports Hall, Workshop, Llangennith House and Beaver Information Centre; battery storage co-located with each array, about 161 kWh in total; air-to-air heat pumps at the Sports Hall, including hot water for the showers, and at the Beaver Information Centre; and a 12 kW electric boiler at Llangennith House. The works also include removal of the redundant oil boilers and tanks, export limitation, metering and monitoring, DNO commissioning forms and witness testing, and a bilingual funding plaque. The grid connection is 66 kW with G100 export limitation. Ynni Teg makes the G99/G100 application to NGED for the Trust. The works are funded by a Welsh Government capital grant through the Ynni Cymru Capital Grant Programme. Award is conditional on the Grant Award Letter. This is a two-stage appointment: Stage 1 is design, and Stage 2 (supply and installation) goes ahead once the Trust issues a written notice to proceed. The grant deadline of 31 March 2027 is fixed, and practical completion is needed by 12 March 2027. MCS certification is required for each technology, held by the tenderer or by a named subcontractor. Joint bids and specialist subcontractors are welcome. Local suppliers and SMEs are encouraged to bid. Supervised site visits are available from 2 to 11 November 2026 by appointment. Clarification questions must be received by 12:00 on 12 November 2026. Tenders must be submitted by email to [email protected] by 12:00 noon on Friday 20 November 2026. The full tender pack is attached to this notice.
Key requirements
- ✓MCS certification for each technology, held by the tenderer or a named subcontractor
- ✓Two-stage appointment: design (Stage 1), then supply and installation (Stage 2) on written notice to proceed; practical completion by 12 March 2027
- ✓Submit by email to [email protected] by 12:00 on 20 November 2026; clarification questions by 12 November 2026; site visits 2-11 November 2026
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →