Blackdown Hills National Landscape Green Finance Accelerator - Floodplain reconnection outline designs, Weir Modifications and high risk water quality outfalls

Devon County Council

Value
£490K
Closes
30 Nov 2026
 
Where
United Kingdom
Contract
Consulting · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 24 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 6 Nov 202624 days to prepare
Found today · 24 Nov 20266 days to prepare

In context

This is a contract notice published by a government body covering consulting. Delivery covers United Kingdom (Europe). It is classified under Climate Adaptation, Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Devon County Council is procuring consultancy design work across three lots: detailed design for two weir modifications on the River Wolf, flood risk assessment and detailed design for flood resilience at three Hele Railway Crossing sites, and water quality outfall studies in the South West. Suited to engineering and environmental consultancies, including SMEs, that can deliver hydrology, flood risk and water-quality design work.

Summary by Raise Lens from the official notice · 18 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

A UK government buyer is procuring consultancy design services under three lots within the Blackdown Hills National Landscape Green Finance Accelerator. Lot one covers detailed design for two weir modifications on the River Wolf, at Marles Weir near Awliscombe and Weston Weir at Heron's Farm near Honiton, delivered alongside the BHNL team. The contract is consulting work with an estimated value of £490K, listed as 490000 GBP. The notice was published on 5 November 2026 and closes on 30 November 2026.

Full description from the source

Devon County Council is procuring consultancy services under the Blackdown Hills National Landscape (BHNL) Green Finance Accelerator, covering floodplain reconnection outline designs, weir modifications and high-risk water quality outfalls. The notice is split into three lots. Lot 1 covers detailed design work for two weir modifications on the River Wolf, which flows into the River Otter: Marles Weir (near Awliscombe, Honiton) and Weston Weir (Heron's Farm, near Honiton). The work is being delivered in collaboration with the BHNL team. Lot 2 is part of the Connecting the Culm FlooR3 Extension Project. It requires Flood Risk Assessment preparation and progression to detailed design to improve flood resilience at the Hele Railway Crossing on the Western Mainline, across three sites: Site 1 Smithincott Extension, Site 2 Spratcot (Cullompton) and Site 3 Sheldon Catchment. Lot 3 is a capital development project to commission specialist consultants, overseen by a Project Steering Group, to deliver two main water-quality-focused strands across the South West of England, excluding Gloucestershire and Bath/Bristol. The page text is truncated before the detailed Lot 3 scope is set out. The expected contract duration is not stated in the available text.

Lots

  • Lot 1: River Wolf Weir Modifications

    Detailed design work for two weir modifications on the River Wolf: Marles Weir (near Awliscombe, Honiton) and Weston Weir (Heron's Farm, near Honiton), working with the BHNL team.

  • Lot 2: Connecting the Culm FlooR3 Extension Project

    Flood Risk Assessment preparation and progression to detailed design to improve flood resilience at the Hele Railway Crossing on the Western Mainline at three sites: Site 1 Smithincott Extension, Site 2 Spratcot (Cullompton) and Site 3 Sheldon Catchment.

  • Lot 3: Water Quality Outfall

    Capital development project to commission specialist consultants, overseen by a Project Steering Group, to deliver two water-quality-focused strands across South West England (excluding Gloucestershire and Bath/Bristol). Detailed scope truncated in source text.

Key requirements

  • Detailed design for two weir modifications on the River Wolf (Marles and Weston weirs) with floodplain reconnection
  • Flood Risk Assessment and detailed design to improve flood resilience at three Hele Railway Crossing sites near Cullompton
  • Water quality focused outfall work across the South West of England (excluding Gloucestershire and Bath/Bristol), overseen by a Project Steering Group

Relevant sectors

How this compares

How this compares

  • Compared with 55 similar tenders (adaptation in United Kingdom) listed in the last 12 months.
  • Its value of $613k is above 49% of the 49 similar tenders that state a value; their median is $625k.
  • It allows 25 days to respond, shorter than the typical 26 days across 39 similar tenders.
  • This is the only similar tender from this organisation listed here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceUK Find a Tender
Published5 Nov 2026
Closes30 Nov 2026
Buyer typeGovernment
TypeConsulting
CountryUnited Kingdom
RegionEurope
CurrencyGBP
Value (USD)$613K
Last verified18 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)