Bos Package For Development Of 250 Mw/ 1000 Mwh Bess At Ntpc Kayamkulam
NTPC Limited (NTPC Green Energy Ltd. (NGEL))
- Value
- Not stated · check listing
- Closes
- 27 Nov 2026
- Where
- India
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers India (Asia). It is classified under Energy Storage, Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
NTPC Green Energy is procuring Balance of System (BOS) works for a 250 MW / 1000 MWh battery energy storage system at Kayamkulam, Kerala. Bidders suited to this are EPC and electrical contractors with utility-scale BESS or solar substation experience, likely requiring larger consortium capacity.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
NTPC Green Energy Ltd. (NGEL) has issued NIT No. NGEL-CS-5831-004(BESS-BOS)-9 for a Balance of System (BOS) package for the development of a 250 MW / 1000 MWh Battery Energy Storage System (BESS) at NTPC Kayamkulam. The tender is classified as a Work Contract. The NIT was issued on 09/11/2026. The notice text provided does not describe the detailed scope, deliverables, or contract duration; these are presumably set out in the Detailed NIT PDF (366.1 KB) and the Salient Technical Features document, which are linked from the page but were not included in the page content.
Key requirements
- Balance of System package for 250 MW / 1000 MWh BESS at NTPC Kayamkulam
- Civil, electrical and grid-connection works at utility scale
- Closing date 27 November 2026 under NIT NGEL-CS-5831-004(BESS-BOS)-9
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Energy storage funding spans batteries, long-duration storage, thermal storage and the controls that dispatch them. Research calls focus on chemistry and system cost. Demonstration programmes test grid services, while tenders buy capacity, flexibility and installation contracts. Buyers usually want evidence of safety certification, round-trip efficiency and a credible route to grid connection.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)