Skip to content
Raise Lens
Tender · TED (EU)

Building demolition and wrecking work and earthmoving work 2026 Tender

Original: Building demolition and wrecking work and earthmoving work – Szikrai Holt Tisza

Országos Vízügyi Főigazgatóság

Value
Not stated · check listing
Closes
30 Dec 2026
 
Where
Hungary
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 49 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 11 Nov 202649 days to prepare
Found today · 24 Nov 202636 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Hungary (Europe). It is classified under Water, Sustainable Buildings and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

A Hungarian state water authority is procuring demolition, wrecking and earthmoving works for the Szikrai and Alpári Holt-Tisza water-supply project, which rebuilds an idle water intake, pumping station and channels in Tiszaalpár, Tiszasas and Tiszaug. Bidders with civil works and earthmoving capacity in Hungary, including SMEs able to subcontract or sub-deliver, fit this tender.

Summary by Raise Lens from the official notice · 18 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The notice concerns the project "Szikrai- és Alpári-Holt-Tisza vízpótlása, valamint a Közép-Homokhátság tiszai vízgyűjtőjének ökológiai állapotjavítása", located in the administrative areas of Tiszaalpár, Tiszasas and Tiszaug. The aim is to restore ecological and long-term agricultural water supply in the Tiszaalpár and Nyárlőrinc area and to provide water replenishment for the Szikrai- and Alpári-Holt-Tisza oxbows by rebuilding and modernising a previously built but now disused water system. The planned works are organised into several project elements. These include reconstruction of the Tiszaalpár Tisza water intake (a pump station with Q=2.6 m3/s capacity, two pump shafts, a Q=1.3 m3/s pump, about 86 m of DN1000 pressure pipe and 2 x 29.30 m of DN900 suction pipe); oxbow water replenishment works (channel regulation, stilling basin and lined channel, a horizontal gauge, about 778 m and 795 m of dredging and cross-section widening, restoration of two existing sluice structures, and an escape point with a 1.6 ha refuge); a Tiszaalpár pressure centre (Q=1.3 m3/s, with pump, electrical network, controls and flow measurement, plus DN700 and DN300 pipes); rehabilitation of about 4,871 m of existing DN700 steel pressure main and construction of about 1,234 m of new DN700 main; surface channel works (dredging and rehabilitation of about 3,612 m of lined channel, culvert and intake structure works, dismantling of hydraulic structures, new culverts and a water-level control structure with Q=5.00 m3/s); and a reservoir filling channel with about 800 m DN1000 closed pipe, about 912 m open channel and a 42 ha ecological reservoir. The contractor is also responsible for design and permitting work, including updating the water-rights construction permit, preliminary surveys and measurements, detailed design, as-built documentation, land-division plans, operating permit documentation, operating rules and maintenance manual, archaeological documentation (ERD I and/or II as required), and all other permits required by law or authorities. The winning bidder must prepare execution and as-built plans in line with Government Decree 191/2009 (IX.15.). The contractor must also verify and ensure DNSH (do no significant harm) compliance during construction under call KEHOP Plusz-1.2.21. Quantities are indicative only because the contract is based on a FIDIC Yellow Book form. The overall contract duration is not stated in the extract.

Key requirements

  • Demolition and wrecking works for existing water-system structures
  • Earthmoving and channel dredging/cross-section widening at Szikrai-Holt-Tisza and Összekötő-csatorna
  • Coordination with pumping station, outlet and reservoir works under the wider water-replenishment project

CPV codes

Relevant sectors

How this compares

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published11 Nov 2026
Closes30 Dec 2026, 00:00 UTC
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountryHungary
RegionEurope
Last verified18 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)

Related tenders