Building installation work – Framework Agreement for the Solar Park - Energielandschap Lageland
Zonnepark Meerstad Noord B.V.
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- Netherlands
- Contract
- Works · Corporate
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a corporate buyer covering construction and works. Bids are invited through a framework agreement. Delivery covers Netherlands and the European Union (Europe). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Framework agreement for turnkey EPC construction of a large-scale solar photovoltaic park (58.9–201 MWp across two phases) on peatland in the Netherlands, including grid integration and battery energy storage coordination. Bidders must be experienced solar EPC contractors capable of delivering utility-scale PV installations with grid-connection expertise and multi-year project management.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Framework Agreement for the construction of the Solar Park Energielandschap Lageland. The EPC contractor must deliver the solar park on a turnkey basis, including the intake substation, with responsibility for coordination with the intake substation supplier and correct integration. Phase 1 comprises approximately 58.9 MWp PV connected to a 21 MW grid connection (shared with BESS), with target operational date Q1 2029. Phase 2 involves expansion by approximately 142.3 MWp PV (total approximately 201 MWp; including third-party contributions approximately 250.5 MWp), with connection upscaling (feed-in capacity up to 260 MW, off-take up to 145 MW) and indicative call-off around 2032/2033. The site covers approximately 175 hectares of wet peatland. The Framework Agreement will be entered into with three parties, with specific contracts awarded via competitive tender to the most economically advantageous tenderer.
Lots
- Lot 1: Phase 1 - Solar Park Construction
Construction of approximately 58.9 MWp PV installation connected to 21 MW grid connection (shared with BESS), including intake substation integration. Target operational date Q1 2029.
- Lot 2: Phase 2 - Solar Park Expansion
Expansion by approximately 142.3 MWp PV (total approximately 201 MWp; including third-party contributions approximately 250.5 MWp), with connection upscaling to 260 MW feed-in capacity and 145 MW off-take capacity. Indicative call-off around 2032/2033. Currently secured within Framework Agreement, to be called off via mini-competition between Framework Contractors.
Key requirements
- Turnkey EPC delivery of solar PV park (Phase 1: 58.9 MWp; Phase 2: 142.3 MWp expansion)
- Integration of intake substation and coordination with battery energy storage supplier
- Grid connection management (21 MW Phase 1; up to 260 MW feed-in capacity Phase 2)
- Peatland site management and environmental compliance (175 ha wet peatland)
- Phased delivery with Phase 1 operational target Q1 2029; Phase 2 call-off via mini-competition ~2032/2033
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in framework agreements; typical only, not this buyer’s list. Check the official notice.
- Selection questionnaire or qualification form
- Company registration certificate
- Audited financial statements
- Insurance certificates
- Case studies or references for similar work
- Quality, health and safety, and environmental policies