Construction of PV Stare Brynki 9.03872 MW photovoltaic plant
Original: Construction work for power plant – Przedmiotem Zamówienia jest wykonanie robót budowlanych pn.: PV Stare Brynki o mocy przyłączeniowej do 9,03872 MW i mocy zainstalowanej do 9,03872 MW.
ENEA Nowa Energia sp. z o.o.
- Value
- Not stated · check listing
- Closes
- 25 Nov 2026
- Where
- Poland
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Poland (Europe). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures a turnkey EPC contract to build and commission a 9.04 MW solar PV installation (Stare Brynki) in Poland, excluding supply of panels and inverters, which the investor supplies. It fits an experienced Polish or EU solar EPC contractor with design, construction, electrical and grid-connection capacity, not a small early-stage firm.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The buyer, ENEA Nowa Energia sp. z o.o., is procuring a turnkey construction and electrical works contract for the PV Stare Brynki photovoltaic installation, with a connection capacity and installed capacity of up to 9.03872 MW each. The scope covers the design, construction and commissioning of the solar installation under the Employer's technical requirements (PFU, HRF) and the draft contract. Supply of photovoltaic panels and inverters is excluded: these are supplied as investor-furnished items, but their placement and installation remain the contractor's responsibility. The contractor must also carry out all tasks needed to bring the installation into commercial operation. This includes obtaining outstanding permits, including the permit for use, completing required tests and inspections, meeting requirements from the Employer, panel manufacturers and the Distribution System Operator, and complying with applicable law and standards. The project is co-financed under loan agreement no. NR KE26-02843 from the National Recovery and Resilience Plan (KPO), investment G3.1.4 'Support for the national energy system (Energy Sector Support Fund)' under RePowerEU component G. The expected contract duration is not stated in the available text.
Key requirements
- Turnkey design, construction and electrical works for 9.03872 MW PV plant, excluding panels and inverters
- Investor-supplied panels and inverters; contractor handles installation, layout and commissioning
- Obtain outstanding permits, grid operator (OSD) approvals, testing and commercial operation handover; funded under RRF/RePowerEU loan
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)