Wastewater treatment plant construction work: green energy production centre using circular economy
Original: Wastewater treatment plant construction work – Budowa centrum produkcji zielonej energii z wykorzystaniem gospodarki obiegu zamkniętego
Regionalne Centrum Gospodarki Wodno-Ściekowej S.A.
- Value
- Not stated · check listing
- Closes
- 26 Nov 2026
- Where
- Poland
- Contract
- Mixed · Utility
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a utility covering a mix of works, supplies and services. Bids are invited through an open procedure. Delivery covers Poland (Europe). It is classified under Water, Energy Storage and Renewable Energy and 1 other against the sustainability taxonomy rather than matched on keywords.
Summary
A Polish municipal water utility is procuring design, permitting, construction and initial equipment supply for a wastewater-based green energy production centre built on circular-economy principles. Bidders with design-build capacity for large wastewater and energy infrastructure, typically established contractors or consortia, fit best.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The procurement covers the design documentation for the investment task "Budowa centrum produkcji zielonej energii z wykorzystaniem gospodarki obiegu zamkniętego" (construction of a green energy production centre using a circular economy approach). The contract includes transferring the author's economic property rights in that design documentation to the Contracting Authority, obtaining all consents and permits needed for construction works, and exercising author's supervision over the works. The contract also covers carrying out the investment works based on that design. Deliverables further include supplying consumable materials for the first fill, commissioning and start-up, and the first full year of operation of the supplied equipment, plus servicing of selected supplied equipment. The detailed scope and method of performance are set out in Annex No. 9 to the SWZ (the Functional-Utility Programme, "PFU"), which is marked as confidential. The essential contract terms are in Annex No. 8 to the SWZ. The page does not state the expected duration.
Key requirements
- Prepare design documentation, transfer author's rights, obtain permits, and provide author's supervision
- Build the investment on the basis of the design under the Functional-Utility Programme (PFU, confidential)
- Supply consumables for first fill, commissioning and first full operating year, plus service for selected equipment
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)