Renewable energy sources in Gorzyce, Godów, Kornowac and Radlin municipalities – repeat
Original: Solar installation – Odnawialne źródła energii w Gminie Gorzyce, Godów, Kornowac i Radlin - powtórka
Miasto Radlin
- Value
- Not stated · check listing
- Closes
- 8 Dec 2026
- Where
- Poland
- Contract
- Mixed · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 30 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Poland (Europe). It is classified under Renewable Energy, Energy Storage and Heating and Cooling and 1 other against the sustainability taxonomy rather than matched on keywords.
Summary
The Radlin municipality is procuring design and turnkey supply, installation and commissioning of rooftop solar PV systems with battery energy storage across eight public buildings in Radlin. Local SME solar installers with PV and storage experience and the ability to deliver small-to-medium rooftop systems fit this tender well.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The municipality of Radlin in Poland is buying the design and turnkey supply, installation and commissioning of rooftop solar photovoltaic systems, with battery energy storage at several sites, across eight public buildings in Radlin. Installations are sized from 4 to 18 kWp per building, and storage is at least 5 to 10 kWh at several locations. The work must follow the functional and utility specification annexed to the tender specifications, and the contract mixes works, supplies and services with on-site delivery. Prospective bidders should weigh the buildings, system sizes and storage requirements against their experience with small and medium rooftop systems. The tender is listed as a repeat of an earlier procedure covering renewable energy sources in several neighbouring municipalities. It was published on 23 November 2026 and closes on 8 December 2026.
Full description from the source
The Miasto Radlin (Radlin Town) is procuring the design and turnkey delivery of a public investment task titled "Odnawialne źródła energii w Gminie Gorzyce, Godów, Kornowac i Radlin - powtórka" (renewable energy sources, repeat procedure). The contractor must design, supply, install and commission photovoltaic (PV) installations and energy storage systems on public buildings in the Gmina Radlin. Part 1 covers PV installations with supporting infrastructure on nine buildings, with minimum capacities stated per site: the PSZOK waste facility (min. 4.05 kWp PV, min. 5.0 kWh storage); Miejska Biblioteka Publiczna Filia nr 1 / OSP (min. 5.4 kWp); Miejska Biblioteka Publiczna at ul. Orkana 5 (min. 4.05 kWp); the "Sokolnia" sports facility (min. 18.0 kWp PV, min. 5.0 kWh storage); the Ośrodek Pomocy Społecznej (min. 10.35 kWp PV, min. 5.0 kWh storage); the Zakład Gospodarki Komunalnej (min. 6.75 kWp PV, min. 5.0 kWh storage); the ZGK magazine at ul. Rymera 15G (min. 6.3 kWp PV); and the Straż Miejska (min. 13.05 kWp PV, min. 10.0 kWh storage). Detailed scope of works is set out in the Functional and Utility Specification (PFU), Annex 1 to the SWZ (tender specifications), and in the draft contract, Annex 2.1 to the SWZ, both of which form an integral part of the SWZ. Contract duration is not stated on the page.
Key requirements
- Design and turnkey delivery of PV installations (4–18 kWp per building) at eight Radlin public buildings
- Battery energy storage of at least 5–10 kWh at several sites
- Installation, commissioning, and compliance with the Polish PFU specification in SWZ Annex 1
CPV codes
Relevant sectors
How this compares
How this compares
- Compared with 292 similar tenders (renewables in Poland) listed in the last 12 months.
- It allows 15 days to respond, shorter than the typical 22 days across 222 similar tenders.
- The same organisation listed 1 other similar tender here in the last 12 months.
Closest open tenders
- Construction of PV Stare Brynki 9.03872 MW photovoltaic plant
- Solar PV roof installation with energy storage at Ministry of Finance building
- Green energy for Kraśnik: photovoltaic installations with energy storage supply
- 436.17 kW Solar Farm with Infrastructure for Mikołów Wastewater Plant
- Solar PV plant with energy storage at Sosnowiec bus depot
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)