436.17 kW Solar Farm with Infrastructure for Mikołów Wastewater Plant
Original: Construction work for power plant – Budowa farmy fotowoltaicznej o mocy 436,17 kW wraz z infrastrukturą towarzyszącą na potrzeby oczyszczalni ścieków „Centrum” w Mikołowie
Zakład Inżynierii Miejskiej Sp. z o.o. w Mikołowie
- Value
- Not stated · check listing
- Closes
- 27 Nov 2026
- Where
- Poland
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Poland (Europe). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
A Polish municipal utility is tendering construction of a 436.17 kW ground-mounted solar PV farm with a cable route and grid connection for the Centrum wastewater treatment plant in Mikołów. It suits experienced solar EPC or construction contractors able to deliver PV mounting, electrical works and TAURON grid integration.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The buyer, Zakład Inżynierii Miejskiej Sp. z o.o. w Mikołowie, is procuring the construction of a 436.17 kW photovoltaic farm with associated infrastructure at the "Centrum" wastewater treatment plant in Mikołów, Poland. The scope includes laying a cable route to a transformer station. The cable route will run across four plots owned by the Contracting Authority (1946/106, 1712/106, 1943/108, 1940/118). The photovoltaic farm is an unattended facility for electricity generation. Panels will be mounted on support structures made of vertical metal load-bearing profiles driven into the ground with a pile driver, and steel inclined horizontal frames. The structures are standard, system-based, and made from prefabricated elements. Alternative materials are permitted if their load-bearing properties are no worse than steel. Deliverables include: construction and assembly works per the design documentation; connection of the new PV farm to a newly built switchboard at the wastewater plant; coordination with TAURON Polska Energia S.A. for grid integration; testing, trials, commissioning and preparation of handover documents; as-built surveying; and start-up of the installation. Detailed specifications are set out in Annex 1 to the SWZ (Specification of the Subject of Contract, OPZ) and the design documentation. The contract duration is not stated in the notice excerpt.
Key requirements
- Build 436.17 kW PV farm on steel mounting structures per design documentation
- Connect farm to new switchgear at wastewater plant and coordinate grid integration with TAURON
- Perform tests, commissioning, as-built documentation and handover for operation
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)