Solar installation – energy security PWiK Żory distributed renewable sources

Original: Solar installation – „Zapewnienie bezpieczeństwa energetycznego PWiK Żory Sp. z o.o. poprzez budowę sieci instalacji rozproszonych źródeł energii odnawialnej”

Przedsiębiorstwo Wodociągów i Kanalizacji Żory Sp. z o.o.

Value
Not stated · check listing
Closes
Not stated · check listing
Where
Poland
Contract
Mixed · Utility

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice published by a utility covering a mix of works, supplies and services. Delivery covers Poland and the European Union (Europe). It is classified under Renewable Energy and Energy Storage against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures design, supply, and installation of three distributed solar photovoltaic systems (totalling ~165 kWp) with energy storage for a municipal water utility in Poland. Bidders should be solar EPC contractors or consortia with PV installation, battery storage integration, and civil works capability.

Summary by Raise Lens from the official notice · 22 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The contract concerns the execution of photovoltaic installations as part of the project "Ensuring energy security of PWiK Żory Sp. z o.o. through the construction of a distributed renewable energy sources network." The procurement is mixed in nature and includes supply of equipment and materials necessary for execution, services, and construction works. The scope comprises three tasks: Task I: Construction of a 25 kWp photovoltaic installation on the roof of a hydro-pumping station building (currently archive facility) at W. Pawlikowski housing estate in Żory, including a minimum 41 kWh energy storage system and necessary structures/infrastructure per technical design by MPPV Projekt Piotr Mędzelowski. Task II: Construction of a 90 kWp photovoltaic installation on the roof of a water treatment plant building and on a slope near raw and treated water tanks at ul. Skośna 9 in Żory, comprising 50 kWp on the treatment plant roof and 40 kWp on the slope per technical design. Task III: Construction of a 49.68 kWp photovoltaic installation on parking canopies and an administrative building roof at ul. Wodociągowa 10 in Żory, comprising 13.8 kWp (canopy 1), 27.6 kWp (canopy 2), and 8.28 kWp (administrative building roof) per technical design. All work shall be executed in accordance with project documentation, contract template, and tender specifications.

Lots

  • Lot I: Photovoltaic installation – Hydro-pumping Station Building

    Construction of 25 kWp photovoltaic installation with minimum 41 kWh energy storage system on hydro-pumping station building roof at W. Pawlikowski housing estate in Żory, including necessary structures and infrastructure per technical design.

  • Lot II: Photovoltaic installation – Water Treatment Plant

    Construction of 90 kWp photovoltaic installation (50 kWp on water treatment plant roof, 40 kWp on slope near raw and treated water tanks) at ul. Skośna 9 in Żory with necessary structures and infrastructure per technical design.

  • Lot III: Photovoltaic installation – Parking Canopies and Administrative Building

    Construction of 49.68 kWp photovoltaic installation (13.8 kWp canopy 1, 27.6 kWp canopy 2, 8.28 kWp administrative building roof) on parking canopies and administrative building roof at ul. Wodociągowa 10 in Żory with necessary structures and infrastructure per technical design.

Key requirements

  • Design and installation of three distributed solar PV systems (25 kWp, 90 kWp, 49.68 kWp) across three municipal water utility sites
  • Energy storage system minimum 41 kWh capacity integrated with Task I installation
  • Civil works, structural design, and infrastructure per technical-execution project by MPPV Projekt
  • Compliance with Polish technical standards and grid connection requirements for distributed generation

CPV codes

How this compares

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published27 Jul 2026
Buyer typeUtility
TypeMixed
DeliveryOn-site
CountryPoland
RegionEurope
CurrencyPLN
Last verified22 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)