Skip to content
Raise Lens
Tender · TED (EU)

Solar installation – supply and installation of eight energy autonomy systems in Gdańsk

Original: Solar installation – Kompleksowa dostawa i montaż ośmiu systemów autonomii energetycznej obiektów użyteczności publicznej w Gdańsku

Gmina Miasta Gdańska

Value
Not stated · check listing
Closes
Not stated · check listing
Where
Poland
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Poland and the European Union (Europe). It is classified under Renewable Energy and Energy Storage against the sustainability taxonomy rather than matched on keywords.

Summary

Procurement of design, supply, and installation of eight solar photovoltaic systems (49.92 kWp each) with battery energy storage across public buildings in Gdańsk. Bidders must be experienced solar installers capable of delivering turnkey renewable-energy systems to multiple sites within 180 days.

Summary by Raise Lens from the official notice · 21 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Comprehensive supply and installation of eight factory-new photovoltaic systems with energy storage for public utility facilities in Gdańsk. The scope includes: (1) Primary School No. 81 – 49.92 kWp with 70 kWh storage; (2) Primary School No. 12 – 49.92 kWp with 80 kWh storage; (3) General Secondary School Complex No. 8 – 49.92 kWp with 80 kWh storage; (4) Primary School No. 48 – 49.92 kWp with 80 kWh storage; (5) Primary School No. 39 – 49.92 kWp with 40 kWh storage; (6) Vocational and Continuing Education Center No. 1/GCUW – 49.92 kWp with 80 kWh storage; (7) Gdańsk Benefit Services Center – 49.92 kWp with 80 kWh storage; (8) Secondary School No. XX – 49.92 kWp with 40 kWh storage. Implementation period: 180 days from contract signature, not exceeding 30 November 2026. Detailed specifications provided in contract template and attachments.

Key requirements

  • Supply and installation of eight factory-new photovoltaic systems, each 49.92 kWp capacity
  • Battery energy storage systems ranging 40–80 kWh per site
  • Delivery and commissioning within 180 days, by 30 November 2026
  • Installation across eight public buildings (schools, vocational centre, municipal service centre)

CPV codes

How this compares

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published27 Jul 2026
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountryPoland
RegionEurope
CurrencyPLN
Last verified21 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)