Solar PV plant with energy storage at Sosnowiec bus depot 2026 Tender
Original: Solar photovoltaic modules – Budowa elektrowni fotowoltaicznej wraz z magazynem energii na terenie zajezdni autobusowej w Sosnowcu przy ulicy Lenartowicza 73
PRZEDSIĘBIORSTWO KOMUNIKACJI MIEJSKIEJ SP. Z O. O.
- Value
- Not stated · check listing
- Closes
- 27 Nov 2026
- Where
- Poland
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Poland (Europe). It is classified under Renewable Energy, Energy Storage and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The contracting authority seeks design and construction of a roughly 600 kWp solar PV plant with a minimum 2000 kWh battery energy storage on a bus depot in Sosnowcz, Poland. Suited to experienced Polish PV and energy-storage EPC contractors, with design-build scope that a consortium or established installer would most likely deliver.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Przedsiębiorstwo Komunikacji Miejskiej Sp. z o.o. in Sosnowiec is procuring the construction of a solar photovoltaic power plant with an energy storage system at its bus depot at ul. Lenartowicza 73, Sosnowiec, Silesian Voivodeship. The investment is described in the design brief as a photovoltaic plant of up to about 600 kWp with associated infrastructure, including an energy storage unit with a minimum capacity of 2000 kWh. It will be built on several cadastral plots (nos. 3460, 1956/3, 1955/21, 2006/23, 1955/6 to 1955/13) in the Zagórze precinct. The final location of the plant and storage within these plots is to be agreed with the Contracting Authority. The scope has three components. First, the contractor must prepare complete design documentation under Polish construction law, including obtaining grid connection approvals from OSD Tauron, a final building permit from the Sosnowiec City Office, and fire-safety and other coordination approvals. The design must be agreed with Tauron Dystrybucja S.A. before construction starts. Second, the contractor must carry out the construction and installation works on ground-mounted structures, including commissioning, testing and control measurements, and must deliver a completed, usable facility. Preparatory works are included, such as removing concrete slabs unless the buyer specifies otherwise. Third, the designers must provide author's supervision (nadzór autorski) during construction under Article 20(1)(4) of the Polish Construction Law. The main purpose is to provide an alternative source of electricity for charging electric buses. The chargers are fed from a two-container transformer station marked ST-2 on the site plan. Full technical requirements are set out in Chapter III of the SWZ (tender documentation), the Functional-Utility Programme (PFU, Annex 6 to the SWZ) and the PPU (Annex 3 to the SWZ). The duration is not stated on this page.
Key requirements
- Design documentation, permits and OSD Tauron grid connection agreement
- Construction of ~600 kWp ground-mounted PV with minimum 2000 kWh energy storage
- Commissioning and handover of a finished, grid-connected installation
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)