Solar PV roof installation with energy storage at Ministry of Finance building
Original: Solar panel roof-covering work – Wykonanie, dostawa i montaż instalacji fotowoltaicznych wraz z magazynami odnawialnych źródeł energii na części wysokiej poddasza budynku Ministerstwa Finansów - realizacja w formule zaprojektuj i wybuduj
Ministerstwo Finansów
- Value
- Not stated · check listing
- Closes
- 25 Nov 2026
- Where
- Poland
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Poland (Europe). It is classified under Renewable Energy, Energy Storage and Sustainable Buildings against the sustainability taxonomy rather than matched on keywords.
Summary
The Polish Ministry of Finance is procuring a design-and-build contract for rooftop solar PV installations with battery energy storage on part of its high-attic building, including design documentation, permitting support, commissioning and monitoring. It suits an EPC contractor or installer with PV and design capacity, and SMEs could bid as subcontractors or partners.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The procurement concerns the design, supply, installation and commissioning of photovoltaic (PV) installations with renewable energy storage (magazyny energii) on part of the high attic (wysokie poddasze) of the Ministry of Finance building in Warsaw-area Poland, delivered on a design-and-build (zaprojektuj i wybuduj) basis under Polish public procurement rules (SWZ, PPU, PFU). The scope includes preparation of design documentation: technical design, architectural-construction design, and a site development plan if required. The contractor must support the contracting authority in administrative proceedings before the MWKZ (heritage conservation authority) and BAiPP (construction authority), covering the building permit and approval of the adopted design solutions at each stage. The contractor must deliver, install and effectively commission complete PV installations in accordance with the design documentation and the works permit. Work is split into two execution packages by roof segments: segments B1, D1, E1' (13, 21 and 12 PV panels) and segments D2, D3, B2 (17, 24 and 13 PV panels), with the installation to be handed over in fully operational, ready-for-use condition. Additional obligations include all statutory notifications for the PV installation (including registration of the micro-installation with the Distribution System Operator and notification to the State Fire Service), supply and installation of a monitoring and PV management system, technical and author's supervision under the Polish Construction Law, preparation of as-built, instructional and operational documentation per the Functional-Utility Programme (PFU, Annex 1 to PPU), and operator training. Detailed works requirements and contract conditions are set out in the Draft Contract Terms (PPU, Annex I to SWZ) and the PFU. Expected duration is not stated on this page.
Key requirements
- Design documentation (technical and architectural-construction) plus permit support before MWKZ and BAiPP
- Supply, install and commission PV panels across segments B1, D1, E1, D2, D3, B2 with energy storage
- Grid connection notification to the DSO and fire service notification, plus monitoring system
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)