Skip to content
Raise Lens
Tender · TED (EU)

Construction work – small mountain water-retention structures design and build

Original: Construction work – Wykonanie kompletnej dokumentacji projektowej i robót budowlanych obiektów małej retencji górskiej na terenie Nadleśnictwa Andrychów

Skarb Państwa Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo Andrychów

Value
Not stated · check listing
Closes
Not stated · check listing
Where
Poland
Contract
Mixed · Soe

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice published by a state-owned enterprise covering a mix of works, supplies and services. Delivery covers Poland (Europe). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures complete design documentation and construction of small mountain water-retention structures (reservoirs and culverts) within a Polish state forest district. Bidders must be capable of delivering integrated engineering design, permitting, and full construction execution.

Summary by Raise Lens from the official notice · 19 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The contract scope involves preparation of complete project documentation for mountain water retention objects (small retention facilities) including obtaining all required legal opinions, approvals and administrative decisions under Polish Building Law, as well as execution of construction works. Specifically, this concerns Part 1 - 02-01-1.1-01: Reconstruction of the Jawiszowice reservoir on the Różany stream with culvert renovation in the Polanka Wielka Forestry, located within the Andrychów Forest District. The contractor must obtain all project designs, opinions, decisions and approvals necessary for a final building permit decision. Minimum parameters for surface area, capacity and volume specified in the functional-utility program must be achieved, with the buyer allowing parameter increases without cost adjustment. Construction works shall be executed based on the prepared documentation.

Bidder eligibility

Bidders must be capable of preparing complete project documentation including all required legal opinions, approvals and administrative decisions under Polish Building Law (Act of 7 July 1994). Contractor must be authorized to act on behalf of the buyer in obtaining building permits. Ability to execute construction works based on prepared documentation required.

Key requirements

  • Complete design documentation and all required permits/approvals under Polish Building Law
  • Construction of small water-retention reservoir (Jawiszowice) and culvert rehabilitation in mountain forest setting
  • Minimum capacity/surface/volume parameters specified; contractor may increase without cost escalation
  • Contractor bears cost of obtaining all necessary administrative decisions and permits

CPV codes

Relevant sectors

Water tendersInfrastructure

How this compares

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published20 Jul 2026
Buyer typeSoe
TypeMixed
DeliveryOn-site
CountryPoland
RegionEurope
CurrencyPLN
Last verified19 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)