Design engineering mission for ground-mounted solar PV plant at Lannemezan hospital 2026 Tender
Original: Mission de maîtrise d'oeuvre pour la réalisation d'une centrale photovoltaïque au sol destinée à l'autoconsommation au CH de LANNEMEZAN
Centre Hospitalier de Lannemezan
In context
This is a contract notice published by a government body covering services. Delivery covers France (Europe). It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.
The Centre Hospitalier de Lannemezan seeks a design engineering firm (maîtrise d'oeuvre) across all project phases to deliver a ground-mounted solar PV plant for fully self-consumed electricity with no grid injection. Architecture or engineering consultancies with solar PV and public-buildings experience, including SMEs, fit this scope.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Le Centre Hospitalier de Lannemezan lance une procédure adaptée pour une mission de maîtrise d'œuvre relative à la réalisation d'une centrale photovoltaïque au sol destinée à l'autoconsommation. Le projet est une autoconsommation totale, sans injection sur le réseau local de distribution d'électricité. Le lieu d'exécution est le code NUTS FRJ26 (Hautes-Pyrénées). La mission couvre les phases suivantes : APS (avant-projet sommaire), APD (avant-projet détaillé), PRO (projet), DCE (dossier de consultation des entreprises), ACT (assistance aux contrats de travaux), VISA (visa des études d'exécution), DET (direction de l'exécution des travaux) et AOR (assistance aux opérations de réception). La durée d'exécution n'est pas précisée dans l'avis. Les offres doivent être déposées exclusivement par voie dématérialisée. Les candidats doivent consulter le règlement de la consultation (RC) et le dossier de consultation des entreprises (DCE) sur le profil acheteur pour le détail des prestations et des exigences.
Bidder eligibility
Les pièces de candidature exigées ne sont pas détaillées dans l'avis. La section 6 renvoie au règlement de la consultation pour les justifications de capacités et qualités du candidat, ainsi que pour les documents à produire par l'attributaire avant signature (formulaire NOTI1). Aucun seuil financier, référence ou certification n'est mentionné dans l'avis. Une langue de l'offre est autorisée : le français.
How bids are scored
Attribution au critère de l'offre économiquement la plus avantageuse, appréciée selon les critères énoncés dans le cahier des charges (RC, lettre d'invitation ou document descriptif). La pondération entre prix et qualité, ainsi que la liste détaillée des critères, ne sont pas précisées dans l'avis.
Key requirements
- ✓Full design engineering mission across APS, APD, PRO, DCE, ACT, VISA, DET and AOR phases
- ✓Ground-mounted solar PV plant designed for total self-consumption with no grid injection
- ✓Works supervision and as-built reception for hospital site in Lannemezan, France
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
- Compared with 93 similar tenders (renewables in France) listed in the last 12 months.
- Similar tenders that state a value range from $17k to $3.0m, with a median of $275k (9 tenders).
- It allows 32 days to respond, longer than the typical 30 days across 70 similar tenders.
- This is the only similar tender from this organisation listed here in the last 12 months.
Closest open tenders
- Works contract for timber-framed photovoltaic carport on Cézeaux campus
- Excitation system renovation, groups 1-6, Ramier hydroelectric plant
- Construction of a vertical geothermal probe field and its surface distribution network
- Owner's project assistance for managing Villiers-le-Bel/Gonesse geothermal intercommunal syndicate
- Construction of 6 photovoltaic carports for collective self-consumption in Perpignan
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →